PROJECT SUMMARY
<br />TOTAL LAND AREA:
<br />BUILDING AREA:
<br />TOTAL LOT 2 AREA COVERAGE
<br />OF PROPOSED CARPORTS:
<br />STORAGE TANK HEIGHT:
<br />CARPORT CANOPY HEIGHT:
<br />LOT 2, BUILDING C SETBACKS
<br />AFFECTED BY AMENDMENT:
<br />LOT 2, BUILDING C PARKING:
<br />GENERAL NOTES
<br />1.
<br />NO CHANGES PROPOSED
<br />NO CHANGES PROPOSED
<br />33,489 SF CARPORT COVERAGE (APPDX. 197 SPACES COVERED)
<br />45.00 FEET
<br />28.00 FEET
<br />REAR YARD ABUTTING A SIMILAR ZONE DISTRICT
<br />ALLOWABLE: 15 FEET
<br />PROPOSED: 70 FEET
<br />EXISTING TO REMAIN:
<br />STANDARD:
<br />HANDICAP:
<br />TOTAL
<br />EXISTING PARKING TO
<br />STANDARD:
<br />HANDICAP:
<br />TOTAL
<br />THE PROPERTY IS ZONED I -INDUSTRIAL.
<br />318 SPACES
<br />9 SPACES
<br />327 SPACES
<br />BE COVERED BY SOLAR CARPORTS:
<br />93 SPACES
<br />6 SPACES
<br />99 SPACES
<br />2. ALL SETBACKS AND LAND USE REQUIREMENTS SHALL CONFORM TO THE CITY
<br />OF LOUISVILLE, COLORADO ZONING AND LAND USE REGULATIONS IN EFFECT
<br />AS OF THE DATE OF APPROVAL OF THIS PLANNED UNIT DEVELOPMENT BY THE
<br />CITY OF LOUISVILLE, COLORADO.
<br />3. THE CITY OF LOUISVILLE IS NOT RESPONSIBLE FOR DAMAGE TO OR REPAIR OF
<br />MONUMENT SIGNS DUE TO UTILITY MAINTENANCE.
<br />4. THE CITY OF LOUISVILLE IS NOT RESPONSIBLE FOR DAMAGE TO PAVEMENT
<br />SURFACES OR LANDSCAPING CAUSED DURING REPAIR OR MAINTENANCE
<br />ACTIVITIES OF UTILITIES LOCATED WITHIN PUBLIC UTILITY EASEMENTS.
<br />5. SIGNS FOR THIS LOT HAVE BEEN APPROVED BY ALL OWNERS TO FOLLOW
<br />SIGN CODE.
<br />LOUISVILLE CORPORATE CAMPUS AT CTC
<br />PLANNED UNIT DEVELOPMENT AMENDMENT #2
<br />LOCATED IN THE SOUTHEAST QUARTER OF SECTION 16,
<br />TOWNSHIP 1 SOUTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN,
<br />CITY OF LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO
<br />SHEET INDEX
<br />1 OF 9 COVER SHEET
<br />2 OF 9 UTILITY PLAN
<br />3 OF 9 GRADING PLAN
<br />4 OF 9 BUILDING "C" FLOOR PLAN
<br />5 OF 9 BUILDING "C" SOUTH ELEVATION
<br />6 OF 9 BUILDING "C" WEST & EAST ELEVATIONS
<br />7 OF 9 BUILDING "C" NORTH ELEVATION
<br />8 OF 9 LANDSCAPE PLAN
<br />9 OF 9 LANDSCAPE PLAN
<br />LEGAL DESCRIPTION:
<br />LOT 1, 2 & 3 OF THE LOUISVILLE CORPORATE CAMPUS AT CTC, REPLAT A._
<br />AMENDMENT PROJECT DESCRIPTION:
<br />THIS AMENDMENT INCLUDES THE FOLLOWING CHANGES FROM THE
<br />APPROVED PUD:
<br />1. LOT 2 - CONSTRUCT PARKING SPACE SHADE/SOLAR SHELTERS.
<br />2. LOT 2 - EXPANDING EXISTING SCREENED EQUIPMENT YARDS.
<br />3. LOT 2 - INSTALLATION OF EXTERIOR 45 FOOT HEIGHT WHITE
<br />CYLINDRICAL STORAGE TANKS IN SCREENED EQUIPMENT
<br />YARDS.
<br />4. LOT 2 - UPDATE AND INSTALL NEW SIGNAGE FOR FULL BUILDING
<br />TENANT.
<br />WAIVER REQUESTS:
<br />1. REQUEST FOR THE HEIGHT OF TWO STORAGE TANKS TO BE 45
<br />FEET TALL.
<br />2. REQUEST FOR WALL SIGN TO BE 4 FEET TALL, EXCEEDING THE
<br />MAXIMUM HEIGHT OF 3 FEET IN THE SIGN CODE.
<br />3. REQUEST TO EXCEED ACCESSORY STRUCTURE HEIGHT OF
<br />25 FEET FOR REAR SOLAR CANOPIES.
<br />4. REQUEST TO ALLOW ACCESSORY STRUCTURE FRONT SETBACK
<br />TO 10 FEET INSTEAD OF 30 FEET.
<br />LOUISVILLE
<br />S. 96TH ST.
<br />VICINITY MAP
<br />STATE HIGHWAY 42
<br />DILLON ROAD
<br />TAYLOR AVE.
<br />PRAIRIE WAYd
<br />J
<br />0
<br />CHERRY ST.
<br />S. 104TH ST.
<br />SITE
<br />NORTH
<br />BUILDING C
<br />,k11,1,4,„i,:11641liAl. '11,0,4.1.1U3a,,,,thale110111101.11111ft�i,;� 6,i�i �.�, �u,,..,,..,.��.,,�1,�,�,. ,id:.,
<br />RCH ITECTS
<br />2000 West Littleton Blvd.. Littleton, CO 80120
<br />P. 303.738.8877 ■ F. 303.738.2294 • igarch.corn
<br />OWNERSHIP SIGNATURE BLOCK:.
<br />BY SIGNING THIS FINAL PUD, THE OWNER ACKNOWLEDGES AND ACCEPTS ALL THE
<br />REQUIREMENTS AND INTENT SET FORTH IN THIS FINAL PUD. WITNESS MY( HAND
<br />AND SEAL THIS DAY OF , 20.
<br />OWN ER:
<br />5{zE Goo TECN Co)RT, LlC
<br />LOUISVILLE ocAkr
<br />BY:
<br />-II. CTI(IN\ 0Rex. Tot_CMLW AT()
<br />MAALAGER I}v7Hoc21 isb
<br />CHERYL MERIL
<br />COMM. # 2499164
<br />SAN FRANCISCO COUNTY
<br />NOTARY PUBLIC-CALIFORNIAZ
<br />MY COMMISSION EXPIRES
<br />OCTOBER 03, 2028
<br />\' e V eiv
<br />NOTARY NAME (PRINT)
<br />a ' ,mac ti
<br />NOTARY SIGNATURE
<br />I -I
<br />WITNESS MY HAND AND OFFICIAL SEAL
<br />MY COMMISSION EXPIRES i-0/C /D
<br />PLANNING COMMISION CERTIFICATE:
<br />31"
<br />RECOMMENDED APPROVAL THIS 12th DAY OF June
<br />COMMISSION OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. 9 SERIES 2025
<br />CITY COUNCIL CERTIFICATE:
<br />APPROVED THIS 8th DAY OF July
<br />CITY OF LOUISVILLE, COLORADO.
<br />NO. 47 SERIES 2025
<br />CITY CLERK
<br />PUD
<br />LOUISVILLE CORPORATE CAMPUS
<br />ALTERNATIVE #1
<br />LOUISVILLE CORPORATE CAMPUS
<br />ALTERNATIVE #2
<br />/1S/2S
<br />DATE
<br />DATE
<br />, 2025EY THE PLANNING
<br />, 2025 BY THE CITY COUNCIL OF THE
<br />DATE APPROVE.)
<br />PUD NOV. 17, 2015
<br />PUD NOV. 17, 2015
<br />LOUISVILLE CORPORATE CAMPUS PUD FEB. 18, 2019
<br />ALTERNATIVE #1, AMENDMENT #1
<br />LOUISVILLE CORPORATE CAMPUS IUD
<br />ALTERNATIVE #1, AMENDMENT #2
<br />DATE:
<br />11.12.2024 P.U.D. AMEND
<br />NOTE
<br />THIE SITE BEING
<br />DEVELOPED UNDER
<br />THIS PIJD
<br />THE SITE IS NOT
<br />DEVELOPED UNDER
<br />THIS PUD
<br />MINOR CHANGES
<br />TO ARCHITECTURE,
<br />PARKING,
<br />LANDSCAPING AND
<br />SITE DESIGN
<br />BLDG C - PARKING
<br />SHADE/SOLAR
<br />STRUCT.,
<br />EXPANSION OF
<br />EQUIP. YARD
<br />ALTERNATIVE #1
<br />COVER SHEET
<br />SHEET 1 OF 9
<br />SCALE: 1" = 2000'-0"
<br />
|