My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2025-1907
PORTAL
>
CITY COUNCIL RECORDS
>
ORDINANCES (45.120)
>
2025 Ordinances
>
Ordinance 2025-1907
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 11:06:50 AM
Creation date
11/6/2025 10:01:49 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
Adopting 2024 Building Codes by Reference
Meeting Date
11/3/2025
Doc Type
Ordinance
Signed Date
11/3/2025
Ord/Res - Year
2025
Ord/Res - Number
1907
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c) The structural members (design) i.e., foundations, <br />underpinning, bearing, or framing, will not be altered or changed, and <br />d) The scope of the work will exclude any electrical, plumbing <br />or heating, and <br />e) The TOTAL COST of labor and materials will not exceed <br />$2,500.00, and <br />f) All codes as adopted by the City of Louisville and the State <br />of Colorado shall be adhered to. Failure to do so will result in a double fee <br />required permit. <br />12. Windows that are being replaced in a like -for -like situation with <br />no structural changes to the building do not need a building permit. This is <br />for only those structures that fall under the International Residential Code <br />and are owner occupied. <br />Sec. 15.05.060.- Section R105.2.1 amended —Emergency repairs. <br />Section R105.2.1 of the International Residential Code is hereby <br />amended to read as follows: <br />R105.2.1 Emergency repairs. Where repairs to a structure, <br />equipment replacements and other repairs must be performed in an <br />emergency situation, a permit application shall be submitted within the next <br />working business day to the building official. During a large-scale event <br />such as a hail or wind storm event or tornado, requirements for roofing <br />permits maybe deferred or suspended until such time as provided by the <br />building official. <br />Sec. 15.05.070.- Section R108.2 amended —Schedule of permit fees. <br />Section R108.2 of the International Residential Code is amended to <br />read as follows: <br />R108.2 Schedule of permit fees. For buildings, structures, electrical, <br />gas, mechanical and plumbing systems or alterations requiring a permit, a <br />fee for each permit shall be paid in accordance with a fee schedule adopted <br />by resolution of the City Council from time to time. <br />Sec. 15.05.080.- Section 108.3 amended —Building permit valuations. <br />Ordinance No. 1907, Series 2025 <br />Page 13 of 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.