My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 2002 05 07
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
2002 City Council Minutes
>
City Council Minutes 2002 05 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:41:41 PM
Creation date
11/26/2003 9:23:32 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Signed Date
5/7/2002
Original Hardcopy Storage
7B6
Supplemental fields
Test
CCMIN 2002 05 07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Louisville City Council Meeting <br />May 7, 2002 <br />Page 8 <br /> <br />the cost involved. Bock voiced his belief that a 12,420 SF Police facility meets that goal <br />and noted that all three options propose a 12,420 SF facility. <br /> <br />Bock introduced Police Commander Bill Kingston, and Architect Kurt Roth, representing <br />Roth-Sheppard Architects. <br /> <br />Simmons stated that Option A-1 provides an estimated cost to finish the proposed 2,644 <br />SF Municipal Court space at $211,520. <br /> <br />Simmons reviewed the required additional site work for Phase I. He explained that the <br />15-acre site is planned for other municipal uses in addition to the Police Department. <br />Those uses include a hockey rink, a skateboard park and possibly a new outdoor <br />swimming pool. The additional site work is necessary in order to accommodate those <br />uses. He noted that Staff is requesting authorization to begin the process of the <br />development application. <br /> <br />Darla Franz, 904 Eldorado Lane, Louisville, CO stated that the back of her house faces <br />the property in question. She voiced her concern that there has not been any forum <br />requesting resident input on noise and light pollution, increased traffic and impact on <br />property values. <br /> <br />Simmons explained that the process began with a needs assessment for the Police <br />Department building to determine the required square footage for the facility and noted <br />that number has been determined. The next process is the site work to identify access <br />points along Via Appia and McCaslin. At that point, if authorized to proceed, the <br />Planning Commission and City Council review the Planning and Development <br />application. Public and neighborhood meetings are required and conceptual plans will be <br />presented. <br /> <br />Franz encouraged Council to consider small group meetings and communication with the <br />neighborhoods. <br /> <br />Mayer addressed the communication center and stated that at one time there were plans <br />for Louisville, Erie and Lafayette to jointly build a dispatch center. The preliminary <br />estimates showed that the operational cost would be double and not include capital <br />construction cost. He stated his understanding that when the City of Boulder left the <br />County Communication Center, most of the problems were resolved. He noted that the <br />Town of Superior would continue with the County Communication Center. He stated <br />that he was not clear on why Louisville would be interested in dedicating space for a <br />communication center. He stated that he is not opposed to shell space but is unwilling to <br />document a shell space for Dispatch. He voiced support for the Police Department <br />Building and Municipal Court, but requested that any reference to Dispatch be deleted. <br /> <br />8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.