My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2014 01 21 SP
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
GOLF COURSE ADVISORY BOARD
>
2014 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2014 01 21 SP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:05 PM
Creation date
1/27/2014 11:00:04 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2014 01 21 SP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hole by Hole Analysis <br />GOLF COURSE <br />Louisville. CO <br />Hole 6 <br />Repair fairway /rough areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (-33,150 sf) [R: 30,000 sf] <br />Realign and expand fairway <br />Remove brush and selective trees to <br />open sightline and improve turf quality <br />- by owner <br />Replace bridge, abutments, and <br />cart path approaches that were <br />destroyed by the flood <br />Relocate bridge and realign <br />cart path to mitigate future <br />flood damage <br />Strip sod, level 3,130 sf tee <br />and regrass <br />Remove trees to improve turf <br />quality and open sightlines <br />- by owner <br />Widen cart path at tee <br />Cart Path: 4' x 50' <br />Curbing: 70 If <br />Strip sod, level 1,590 sf tee <br />and regrass <br />Rebuild 1,770 sf tee: <br />Strip sod, remove silt, regrade tee surface, <br />add rootzone mix and reseed <br />Repair rough damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (-3,900 sf) <br />Rebuild 900 sf forward tee: <br />Strip sod, remove silt, regrade tee surface, add <br />rootzone mix and reseed <br />Repair pond banks and 7 fairway damaged by flooding: <br />Strip sod, remove silt, cobbles, and debris regrade for <br />positive surface drainage, and regrass <br />Repair fairway /rough areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (- 21,000 sf) [R: 30,000 sf] <br />Repair abutments and adjacent cart path <br />that were undermined by flood waters <br />Eliminate front greenside bunker, and rebuild right <br />greenside bunker: <br />Remove contaminated sand, replace drainage, restore <br />edges, add new sand and regrass surrounds. <br />Bunker: 925 sf <br />External tile: 125 If <br />Sod: 3,100 sf <br />Thin trees to improve turf quality <br />- by owner <br />Repair 4,800 sf green and surrounds: <br />Strip sod, remove silt, remove "collar dam" <br />add greensmix, regrade and regrass <br />11 <br />KEY <br />Storm Damage Improvement <br />Golf Course Improvement <br />Recommendations <br />Date: January 7, 2014 <br />0 100 200 <br />300 FT <br />
The URL can be used to link to this page
Your browser does not support the video tag.