My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2014 01 21 SP
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
GOLF COURSE ADVISORY BOARD
>
2014 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2014 01 21 SP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:05 PM
Creation date
1/27/2014 11:00:04 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2014 01 21 SP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hole by Hole Analysis <br />GOLF COURSE <br />Louisville. CO <br />Hole 4 <br />Add collection area above fairway to <br />intercept runoff from home sites. <br />Catch Basins: 1 ea <br />Draintile: 185 If <br />Sod: 2,550 sf <br />Flush and remove debris from culvert <br />Realign and expand fairway <br />Shift 1,300 If of cart path to the left <br />side of the fairway (R: 1,200 If] <br />Convert 31,000 sf of out -of -play <br />area to low0maintenance turf in <br />conjunction with hole 3 <br />Rebuild bunker: <br />Bunker: 2,240 sf <br />Extemal tile: 100 If <br />Sod: 6,725 sf <br />Rebuild bunker: <br />Bunker: 2,130 sf <br />External tile: 100 If <br />Sod: 5,600 sf <br />Rebuild bunker: <br />Bunker: 1,485 sf <br />Extemal tile: 50 If <br />Sod: 3,160 sf <br />Rebuild bunker: <br />Bunker: 345 sf <br />External tile: 125 I <br />Sod: 900 sf <br />Widen cart path at green <br />Cart Path: 4' x 50' <br />Curbing: 70 If <br />Repair 4,700 sf green: <br />Strip sod, remove silt, <br />add greensmix, regrade <br />and regrass <br />Convert 9,500 sf of <br />out- of-playarea to <br />low- maintenance turf <br />JAI <br />NIT <br />A <br />Tree removal by owner <br />Relocate 25' x 25' forward ee <br />Sod: 2,250 sf <br />Reconstruct tee <br />Strip sod, relocate /reshape tee surface, <br />add rootzone mix and re- grass. <br />Middle: 35' x 40' <br />Sod: 6,330 sf <br />Repair rough areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regress ( -8,200 sf) <br />nstrucf tees <br />Strip sod, relocate /reshape tee surface, add rootzone mix and re -grass. <br />Back: 25' x 25' <br />Middle Back: 40' x 70' <br />Sod: 6,400 sf <br />9 <br />Rebuild bunker: <br />Bunker: 2,200 sf <br />Extemal tile: 100 If <br />Sod: 9,100 sf <br />onvert 18,500 sf of out -of -play <br />rea to low- maintenance turf <br />Repair fairway /rough areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (- -43,700 sf) [R: 68,000sfj <br />Remove silt from cart path <br />Rebuild bunkers note: <br />Remove contaminated sand, reduce size to improve <br />maintenance, replace drainage, restore edges, add <br />new sand and regrass surrounds, <br />KEY <br />Storm Damage Improvement <br />golf Course Improvement <br />Recommendations <br />Date: January 7, 2014 <br />0 100 200 <br />300 FT <br />
The URL can be used to link to this page
Your browser does not support the video tag.