My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-2004 WINTER
PORTAL
>
COMMUNITY UPDATE NEWSLETTER
>
2003 Quarterly Community Update Newsletter
>
2003-2004 WINTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 11:47:29 AM
Creation date
11/5/2014 2:36:33 PM
Metadata
Fields
Template:
CITYWIDE
Doc Type
Newsletter
Record Series Code
40.260
Record Series Name
Publications
Quality Check
1/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MCCASLIN INTERCHANGE UPDATE <br /> 2004 DOG LICENSES P1he City of Louisville and the Town of Superior are proceeding with <br /> The City Clerk's Office will 1 plans to improve the US 36/McCaslin Boulevard interchange. <br /> begin selling Because of potential future changes to the US 36 corridor, the <br /> 2004 dog licenses improvements will be phased to avoid constructing facilities that would be <br /> Monday, November inconsistent with future improvements to US 36. <br /> Phase I improvements provide for the Denver bound on-ramp to be <br /> 17, 2003. Residents <br /> supplemented with a cloverleaf on-ramp in the southwest quadrant of the <br /> who currently have <br /> their dogs licensed, interchange. Those who currently are southbound on McCaslin Boulevard <br /> should have will no longer have to turn left and cross traffic at the south ramp <br /> received a letter in November by intersection to access eastbound US 36. <br /> which they can update the license In additiona, the existing bridge will be modified to accommodate three <br /> by mail. lanes in each direction and provide for double left turns from the <br /> westbound off-ramp to Superior and also accommodate an additional thru <br /> All dogs must have a current <br /> rabies vaccination to be licensed. lane for northbound traffic. There will also be a continuous lane added to <br /> McCaslin Boulevard to accommodate people wishing to get on westbound <br /> Fees: US 36 from Louisville. <br /> Spayed female dog $2.00 Funds for the project are being provided by Louisville and Superior per <br /> Unspayed female dog $5.00 an agreement executed a number of years ago. The total cost is estimated <br /> Male dog $2.00 to be in the neighborhood of$8 million. Completion of Phase I will <br /> provide immediate relief to the traffic congestion at the interchange. Phase <br /> On April 1, 2004, the fees will II of the improvements will be further developed once the scope of <br /> be increased by $1.00. possible improvements to the US 36 corridor is more fully understood. <br /> The City Clerk's Office is The project is anticipated to start in April of 2004 and be open to traffic <br /> located on the 1st floor of City by the end of November 2004. Additional landscaping and bridge <br /> Hall, 749 Main Street. If you have modifications may continue into the spring of 2005. <br /> any questions about the City's dog Additionally, the RTD park-n-Ride will get upgrades including 150 <br /> licensing program, please call Carol parking spaces on the Louisville side of US 36 and a pedestrian bridge. <br /> Hanson, Deputy City Clerk, <br /> 303.335.4574. US 36 ENVIRONMENTAL IMPACT STUDY UNDERWAY <br /> HIGHWAY 42/96TH e Environmental Impact Statement (EIS) for US 36 has begun. It <br /> STREET CONNECTION will examine transportation improvements in the US 36 <br /> Corridor. The EIS will include the following general tasks: <br /> UPDATE 'What are the transportation needs <br /> esign work was completed <br /> •What are the best improvement options to meet the needs <br /> D on the Highway 42/96th 'What are the impacts, benefits, and trade-offs 36 <br /> Street connection project earlier •What is the preferred alternative <br /> this fall. Bids for constructing the The first step in the project is to outline the "scope" to <br /> project were received in October consider in the EIS. Scoping meetings were held in early November. At the <br /> and Hamon Contractors was end of the scoping process, input will be compiled and summarized into <br /> awarded the contract in the amount key themes for the Scoping Report. The full report, as well as additional <br /> of $7,266,000. information, is available at wwwUS36EIS.com. To be added to the mailing <br /> Construction on the road is list for project updates, go to the web page or call Meghana Shah at <br /> expected to begin before the end of 303.442.7367. It is anticipated the Draft EIS will be complete in Winter <br /> 2003 with the road opening to 2004. For information on the City's involvement please call Heather Balser <br /> traffic in late 2004. at 303.335.4530. <br /> Winter 2003-2004 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.