Laserfiche WebLink
AGREEMENT REGARDING <br />FINAL DESIGN, RIGHT -OF -WAY ACQUISITION AND CONSTRUCTION <br />OF DRAINAGE AND FLOOD CONTROL IMPROVEMENTS FOR DRAINAGEWAY A -2, <br />CITY OF LOUISVILLE AND CITY OF LAFAYETTE <br />12)54" RCP <br />Agreement No. 11- 04.03C <br />Exhibit A -1 <br />(2) 5WX4H RCBC <br />(2) 5WX4H RCBC <br />_._- STRAINAGEWAY 7.1 <br />18.50 TO 48..013 <br />5055_ <br />war <br />(2)60' RCP <br />DRAr <br />5 <br />86 TO 6 <br />\2\ <br />JP <br />P O` =P9t0; <br />DRNNAGEWAY 7 -2 (2) <br />ST& 10.88 TO 18.50 <br />COST= 1576,000 <br />07= 78 CFS <br />O1$ = 181 CFS <br />O+m = 3..83,.��CFS <br />DRAI1ss EEWAY 2(1) <br />TSTA, 114.84 TO 124.81 <br />_ AI 04.00 T.0 10.88 4 <br />cost-= Si o94.00o <br />134 CFO <br />�P,yP19 om 11.13 CF5 <br />,GE tO \3 <br />0p \N p1 <br />p•- 7 3' TALL 36" DIAMETER <br />GROUTED BOULDER DROP <br />STRUCTURE (TYPICAL) <br />PROPOSED STORM <br />SEWER SYSTEM <br />IMPROVEMENTS aA <br />SEE FIGURE 2 <br />EET <br />COST = $1,00700( <br />Q? cps <br />CFS <br />Pry" <br />GF�O OW <br />PP��h <br />04 0, <br />8 <br />PROPOSED CHANNEL <br />CENTERLINE (TYPICAL) <br />ORAINAGEWA1 A 2 '..2, A <br />S78 16(1*06 10 ;67152 <br />72; 51 RCP <br />E1LPIREC'° <br />" COST = 82,46951) l <br />$ 01$0.2.7 as <br />,g8k SEWER SYSTEM STORM <br />_ IMPROVEMENTS <br />-1 t jT ' SEE FIGURE 3 <br />8 <br />121`_4 RCP <br />PRELIMINARY <br />ILS <br />DRAINAGEWAI 8 <br />6 <br />C _ONOIETE PIPE <br />COKTETE DO%CULVHR <br />9 <br />PEW FLOW <br />CFS - Ci161C FEET KR SECOND <br />