My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Space Advisory Board Agenda and Packet 2014 12 10
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
OPEN SPACE ADVISORY BOARD
>
2000-2019 Open Space Advisory Board Agendas and Packets
>
2014 Open Space Advisory Board Agendas and Packets
>
Open Space Advisory Board Agenda and Packet 2014 12 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 8:21:24 AM
Creation date
12/15/2014 11:46:43 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
OSABPKT 2014 12 10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Five -Year Capital Improvement Program <br />Request for Capital Equipment or Capital improvement Project <br />Project or Equipment Identification <br />Prnract Name: ity ervices aci ity <br />Version of Request: <br />Submitting Department' 'vision: ity anagc s a `ice <br />Impacted Departments /Divisions: Par s <br />t -ondmg ourceis <br />Capita' Projects <br />Conservation Trust - Lottery <br />Wastewater Utility <br />Water Utility <br />erce nt <br />25 <br />25'0 <br />254! <br />1 nta I Funding <br />100% <br />Depdrtrnerot Priority <br />Estimated Expenditure Schedule <br />quipment or <br />Project Costs <br />.ear <br />2015 <br />ear <br />2016 <br />ear <br />2017 <br />'ear 4 <br />2015 <br />'ear <br />2019 <br />ive-' ear <br />Total <br />an. • cquisdrort <br />Design & Engineering <br />Other Prof Services <br />Construction <br />Other <br />Capital Equipment <br />6,450,000 <br />6,450,000 <br />Total Project Costs <br />6,450,000 <br />6.450,1 TT <br />Grant s) or Other <br />Project Rcvcnuc <br />1,000,000 <br />1,000,000 <br />Impact to Annual <br />Maint10. Costs <br />Project Location Map, Equipment Identification Photo, or Other <br />Project or Equipment Description and Justification <br />Please provide a general project description and include the cost allocation methodolgy if <br />more than one funding source is requested: <br />The CSF is the base of operations for dozens of staff and in some cases their <br />only work space. It must provide adequate space for numerous large vehicles to <br />maneuver, be loaded, worked on and stored. It must also provide efficient access <br />to hundreds of pieces of maintenance and construction equipment, thousands of <br />spare parts and large volumes of materials. The perception shared among staff is <br />that since the CSF will likely serve as home base for the next 30 to 50 years, and <br />perhaps longer, "We better do it right "_ Program requirements were developed <br />by City staff working in the field who provided the actual numbers for staff, <br />equipment, vehicles, and materials required to be stored on site, these numbers <br />were incorporated into the program design by the design team. There is no <br />superfluous Space at the facility. All space is accounted for. Cost allocation <br />methodolody is primarily space allocation and workflow. <br />Please &ascribe why this project is needed, how it sup porst City -wide goals and <br />objectives, what realistic options or alternatives have been considered, and what payback, <br />or return on investment, has been calculated: <br />The current facility is old, undersized and creates some safety risks. To address <br />this problem, in 2412 City staff, including Public Works and Parks and Recreation <br />and Open Space Departments analyzed design alternatives and how best to <br />address building Lifetime issues, energy savings, workflow, traffic engineering <br />issues, equipment storage, storm drainage and water quality, and flood plain <br />concerns, the new facility will be home base for the next 30-50 years. <br />Please provide a description of any grants and/or other revenue associated with this <br />project and the ongoing operational and !maintenance costs associated with this project.: <br />The City has applied for a DOLA grant to assist in teh construction ofthis project and <br />anticipates reciving approximately $1,000,000. Operational and maintenance costs should <br />be rsimilar to the current facility. The new failicty will be larger, but MPre efficient, so the <br />cost for the extra space will be offset by energy efficiencies. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.