Laserfiche WebLink
City Council <br /> Meeting Minutes <br /> March 18, 2014 <br /> Page 11 of 20 <br /> and stormwater utility bill will increase from $31.62 per month to $37.24 per month. <br /> Under the five-year plan the monthly rate would increase to $55.15 in 2018. <br /> The proposed rate increases reflect the capital improvements listed in the 10-year <br /> Capital Improvements Program for projects, which include a new Wastewater Facility, <br /> upgraded Water infrastructure, and an upgraded or new Stormwater drainage system. <br /> The CIP Budget looks at infrastructure and determines whether it represents the quality <br /> and the level of service; whether it has it reached the end of its lifespan and needs to be <br /> upgraded or replaced. It also looks at equipment to ensure it is within the regulatory <br /> requirements. Some of the projects include the Wastewater Facility and the City <br /> Services Facility. The City Services Facility (CSF) allocates costs for the facility equally <br /> between the Water, Wastewater, Capital Projects, and Open Space and Parks Funds <br /> (25% to each fund). <br /> Another goal of the study was to propose an active rate increase for a first step in a five- <br /> year plan, which will ultimately become a five to ten year plan. The CIP projects list will <br /> be refined or reallocated. <br /> Staff recommended approving Resolution No. 18, Series 2013 and associated rate <br /> tables to increase utility rates for the 2014 calendar year in the amount of 2% for water, <br /> 27.0% for wastewater, and 30.0% for stormwater. <br /> COUNCIL COMMENTS <br /> Council member Loo requested the PowerPoint slides be made part of the public <br /> records and accessible by the Council and the public. <br /> Council member Stolzmann stated her understanding the rate increase is being <br /> requested to cover the City's cost for this year. The Council will look at capital projects <br /> and cost allocations in the upcoming months. Public Works Director Kowar confirmed <br /> this is the annual rate increase and there are not any new rate structures or <br /> reallocations of equity and no changes to the current CIP Budget. <br /> Council member Stolzmann inquired about the charge for the first gallon of water. <br /> Public Works Director Kowar explained the charge for the first gallon of water is for <br /> construction water meters. Finance Director Watson explained the charge for the first <br /> gallon is the bulk water rate. This is a correction as previously there was a higher fee, <br /> but it was charged after the first 10,000 gallons. This charge is for construction sites <br /> only. The increases proposed for residential user rates are 2% for water, 27.0% for <br /> wastewater, and 30.0% for stormwater. <br /> Council member Stolzmann asked if the rate increase is needed if the classes are not <br /> reallocated. Public Work Director Kowar stated the rate increase is needed to equal the <br /> financial plan. City Manager Fleming explained the rate increase will generate enough <br /> 36 <br />