Laserfiche WebLink
Local Agency property to perform major reconstructions along the commuter bikeway <br />pursuant to the Easement. <br />B. The Local Agency shall perform at its own expense, all routine maintenance activities necessary to <br />maintain a safe and functional commuter bikeway within their jurisdiction. Routine maintenance <br />activities to be performed by the Local Agency under this Agreement shall not include any <br />warranty obligations or capital maintenance obligations that are the obligations of CDOT pursuant <br />to the terms of this Agreement. Routine maintenance activities to be performed by the Local <br />Agency under this Agreement shall be performed in accordance with the Local Agency's standard <br />bike path maintenance procedures and shall include, but not be limited to the following: <br />1. Keeping the Bike Path free from obstructions and impediments that may interfere with bicycle <br />and pedestrian traffic, including sand and debris; maintenance of signing, striping and <br />electrical lighting fixtures installed along the Bike Path, including for that portion of the <br />commuter Bike Path facility that crosses or is adjacent to a public street or highway, and <br />repair of damaged Bike Path pavement slabs and subgrades to the extent that such repair is not <br />an obligation of the Design Build Contractor or CDOT as a warranty obligations or a capital <br />maintenance obligation of CDOT. <br />2. Snow removal (snow plowing) along the Bike Path. <br />3. Mowing, tree and shrub upkeep; repair of damaged Bike Path delineation; removal of graffiti <br />from Bike Path pavement, structures and signage; and maintaining and repairing safety fences <br />and railings associated with the commuter Bike Path. <br />4. Stormwater management and water quality responsibilities related to the Bike Path as follows: <br />Maintain stormwater management facilities and structures including inlets, storm sewer pipes, <br />ditches, drainage facilities intended to reduce, detain, convey, and manage stoliiiwater runoff <br />on the Bike Path, "drainage facilities," and facilities intended to provide water quality <br />benefits, "water quality facilities," only as such facilities are associated with the Bike Path, <br />hereinafter referred to as the "Bike Path Stormwater Facilities." Maintenance of the Bike Path <br />Stormwater Facilities shall include routine inspection, sediment removal and repair of the <br />Bike Path Stormwater Facilities as necessary, consistent with the Local Agencies standard <br />procedures. This maintenance obligation for Bike Path Stormwater Facilities does not include <br />any roadway storm water quality ponds constructed as part of this project, regardless of <br />whether such roadway facility is combined with or impacts the Bike Path Stormwater <br />Facilities. <br />Section 4. Term and Termination Provisions <br />1. This Agreement shall be in effect only after it is executed by both Parties. The Maintenance <br />obligations of the Local Agency under this Agreement shall commence on the date of the final written <br />acceptance of the Bike Path by CDOT and will remain in effect until this Agreement is terminated in <br />accordance with the requirements of this Section 4 and both Parties agree to terminate. <br />Page 4 of 9 <br />