My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 March 2017 Newsletter
PORTAL
>
COMMUNITY UPDATE NEWSLETTER
>
2017 Quarterly Community Update Newsletter
>
1 March 2017 Newsletter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 11:47:29 AM
Creation date
3/27/2017 10:05:08 AM
Metadata
Fields
Template:
CITYWIDE
Doc Type
Newsletter
Record Series Code
40.260
Record Series Name
Publications
Quality Check
3/27/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/S <br />R <br />ECEATIONENIO <br />RR <br />• <br /> <br />C <br /> & M S <br />OQUA <br />ENTERREMRRYYRE <br />R <br /> <br />EU <br />SION <br />XPANPDATE <br />- <br />curb appeal and a more interesting visual entry. <br />• <br />additional parking spaces, including increased ADA <br />and senior spaces providing better accessibility to <br />• <br />- <br />ized location for better facility control and public <br />accessibility. <br />After further inspection it has been determined <br />• <br />- <br />Artist's Rendering <br />ory Square Pool building rather than to renovate <br />I <br />air, bathhouse design that includes more deck area <br />- <br />Center facility. <br />Dunakilly Management Group have been hard at <br />one scheduled for early spring. Copies of the pre <br />- <br />- <br />sentation, updated plans, and future updates can be <br />the status of the project. The team from Sink Combs <br />Q <br />FA <br />EQUENTLYTION <br />RSKEDUESS <br />F <br />through conceptual design and voter approval. <br />detailed schematic design. During this phase the <br />When will construction start? <br />• <br />construction to begin in fall 2017 and to be com <br />- <br />- <br />siderations, and continually updated cost analysis. <br />- <br />- <br />tion date at the end of 2018. A detailed construc <br />- <br />- <br />this year. All of the elements and amenities originally <br />planned by the Task Force and approved by voters <br />are still integrated into the detailed schematic design <br />• <br />during construction? <br />have been redesigned since the conceptual phase <br />include: <br />• <br />- <br />Are the weight room, cardio room, and <br />The youth area has been relocated to the front of <br />• <br />• <br /> The <br />additionally giving parents and children easier ac <br />- <br />cess to programs and childcare as they enter the <br />building. <br />March 2017 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.