My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2018-59
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2010-2019 Resolutions
>
2018 Resolutions
>
Resolution 2018-59
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 4:28:58 PM
Creation date
12/19/2018 10:30:09 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Resolution
Ord/Res - Year
2018
Ord/Res - Number
59
Original Hardcopy Storage
7D6
Supplemental fields
Test
RES 2018-59
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A - Amended <br />Windy Gap Fbnring Project <br />Amended Allocation of Costs for Fifth Interim Agreement (Phase 5) <br />Estimated Phase 5 Costa In 2016: S 13,775,950 <br />Participant <br />Requested Share of <br />Storage Phase 5 <br />Volume Of) Cost <br />Broomfield 25,200 $ 4,028,243 <br />CWC WD 330 S 52,751 <br />Erie 6,000 S 959,105 <br />Fort Lupton 1,050 S 167.843 <br />Greeley= 8.750 S 1,398,695 <br />Lafayette 1.800 S 287732 <br />Little Thompson WD 4,8500 S 775.277 <br />Longmont 10,000 S 1,598,509 <br />Loulsvane 2,700 S 431,597 <br />Loveland 1 9,000 S 1,438,658 <br />PRPA 12,000 S 1.918,211 <br />Supenor 4,500 $ 719,329 <br />TOTAL 861180. S . 13,775,950. <br />2016 Phase 5 Costs Per Acre -Foot of Storage $ 159 85 <br />Notes 1 This MOW A relleas Lovatand's teemed swage tweedy based en a September 2016AmmsM .a to 51h Intontn at <br />2 Greesees 'Share of Phase 5 Cost' awil+dos 5279,73911mt G eelsy wdI pay as the fat dt of the reatbcabon of WGFP Oapitudy hoe Frans to Gieaby <br />Exhibti A to 3rd Amendment to 5th Int AgtlExhtbd A 1229/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.