Laserfiche WebLink
EXHIBIT A - Amended <br />Windy Gap Fbnring Project <br />Amended Allocation of Costs for Fifth Interim Agreement (Phase 5) <br />Estimated Phase 5 Costa In 2016: S 13,775,950 <br />Participant <br />Requested Share of <br />Storage Phase 5 <br />Volume Of) Cost <br />Broomfield 25,200 $ 4,028,243 <br />CWC WD 330 S 52,751 <br />Erie 6,000 S 959,105 <br />Fort Lupton 1,050 S 167.843 <br />Greeley= 8.750 S 1,398,695 <br />Lafayette 1.800 S 287732 <br />Little Thompson WD 4,8500 S 775.277 <br />Longmont 10,000 S 1,598,509 <br />Loulsvane 2,700 S 431,597 <br />Loveland 1 9,000 S 1,438,658 <br />PRPA 12,000 S 1.918,211 <br />Supenor 4,500 $ 719,329 <br />TOTAL 861180. S . 13,775,950. <br />2016 Phase 5 Costs Per Acre -Foot of Storage $ 159 85 <br />Notes 1 This MOW A relleas Lovatand's teemed swage tweedy based en a September 2016AmmsM .a to 51h Intontn at <br />2 Greesees 'Share of Phase 5 Cost' awil+dos 5279,73911mt G eelsy wdI pay as the fat dt of the reatbcabon of WGFP Oapitudy hoe Frans to Gieaby <br />Exhibti A to 3rd Amendment to 5th Int AgtlExhtbd A 1229/2017 <br />