My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2019 08 27
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2019 City Council Agendas and Packets
>
City Council Agenda and Packet 2019 08 27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2025 1:40:39 PM
Creation date
8/26/2019 10:09:39 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
Paper copy disposed of on November 12 2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11: City,/ <br />im Louisville <br />COLORADO • SINCE 1878 <br />CITY COUNCIL COMMUNICATION <br />AGENDA ITEM 2 <br />SUBJECT: <br />DATE: <br />UPDATE — MEDIAN LANDSCAPE RENOVATIONS PROJECT <br />AUGUST 27, 2019 <br />PRESENTED BY: NATHAN MOSLEY, DIRECTOR OF PARKS, RECREATION <br />AND OPEN SPACE <br />DESIGNSCAPES COLORADO, CONTRACTOR <br />DESIGN CONCEPTS, LANDSCAPE ARCHITECTS <br />SUMMARY: <br />On April 16, 2019 City Council awarded the Median Landscape Renovations Project to <br />the design build team of Designscapes Colorado and Design Concepts. The majority of <br />medians within the City were developed and landscaped 20 to 30 years ago. <br />Renovations are recommended due to plant material replacement needs, outdated <br />irrigation systems, and in many cases, the concept or landscape theme is not consistent <br />throughout the same boulevard. <br />On July 11 the design build team met with the Public Parks and Landscapes Advisory <br />Board (PPLAB) to review and discuss median precedents and concepts and to define <br />next steps and direction moving forward. Comments from staff were also gathered and <br />the following priorities and objectives were established: <br />• To not "reinvent the wheel" but rather, to work with what we have <br />• To inspect the irrigation systems with regard to replacement of, or salvaging <br />components starting with the point of connection and moving down stream. Staff <br />will play a large roll in this process. <br />• To begin and end each corridor with a focus upon a pop of color in the form of <br />annual plant beds <br />• Tree removal / replacement <br />• Vegetation removal / replacement <br />• To keep budget considerations in mind <br />FISCAL IMPACT: <br />Council has approved $275,000 for phase 1 of the project, which consists of medians <br />on Cherry Street, McCaslin Boulevard and Via Appia. There is an additional $275,000 <br />allocated for 2020 and includes medians on Dillon Road, South Boulder Road and <br />Summit View Drive at Highway 42. There is also $275,000 programmed in the 2021 <br />budget for the median project. <br />The design build team is currently working on detailed cost estimates for the project. <br />Staff will continue to work with the design build team to evaluate costs to ensure that <br />they are aligned with the overall project objectives. Based on the needs of replacing <br />irrigation infrastructure on medians it might be necessary to accelerate some of the <br />CITY COUNCIL COMMUNICATION <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.