My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2020-23
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2020 Resolutions
>
Resolution 2020-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 9:38:48 AM
Creation date
3/27/2020 8:32:44 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
IGA CDOT_Grant Contract for Rock Creek and Coal Creek Trail Connection 2020
Doc Type
Resolution
Signed Date
3/17/2020
Ord/Res - Year
2020
Ord/Res - Number
23
City Property Name
Trails
Original Hardcopy Storage
9C5
Supplemental fields
Year Project
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: 67A848F2-43D5-4DF5-8EF1-747972F4F304 <br />EXHIBIT A — SCOPE OF WORK <br />The Colorado Department of Transportation ("CDOT") will oversee The City of Louisville when the City <br />completes the 104th Street Trail project. (Hereinafter referred to as "this work") CDOT and the City of Louisville <br />believe it will be beneficial to perform this work because it will complete the segment of trail along 104th Street <br />that ties together the Coal Creek Trail with Rock Creek Trail and the Carolyn Holmberg Preserve at Rock Creek <br />Farm. This project will design and construct approximately 2.6 miles of a primarily soft surface, separated multi- <br />use trail generally between Empire Road to the north and the trail head parking lot within the Carolyn Holmberg <br />Preserve. At a minimum, the trail will be 8-feet wide and may include additional trail features such as lighting, <br />benches, bike racks, or similar. <br />This work will conform to the parameters articulated in the Colorado Department of Transportation Standard <br />Specifications for Road and Bridge Construction, AASHTO "A Policy on Geometric Design of Highways and <br />Streets", AASHTO "Roadside Design Guide", and the CDOT Project Development Manual, CDOT M&S <br />Standards, CDOT Design Guide, CDOT Construction Manual, Manual on Uniform Traffic Control Devices, <br />Highway Capacity Manual, City of Louisville Design and Construction Standards, along with all applicable State <br />and Federal guidelines. <br />The design phase of this work is scheduled to begin during fiscal year 2020. The design phase will identify more <br />exact requirements, qualities, and attributes for this work. (Herein after referred to as "the Exact Work"). The <br />Exact Work shall be used to complete the construction phase of the project. The construction phase of the project <br />is estimated to begin in fiscal year 2022 and shall finish as soon as reasonably possible. <br />The City of Louisville is responsible for design, utilities, ROW, environmental, advertisement, and construction <br />management. <br />The project is funded with Multi -Modal Options Funding (MMOF). MMOF funding expenditures shall be <br />invoiced by June 15L of the year they expire. <br />THE REST OF THIS PAGE INTENTIONALLY LEFT BLANK <br />Exhibit A - Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.