Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />March 12, 2015 <br />Page 14 of 23 <br />Office (Bank) <br />Min.1/400 <br />1/125 <br />Max.125% of minimum req'd <br />spaces <br />Recommendations: <br />o Staff acknowledges the development does the following: <br />o Redevelopment is an investment in the community <br />o Proposed use provides needed services within walking distance to surrounding <br />residential, office and sports complex users <br />o City will benefit from: <br />• the platting of Cannon Street <br />• City public parking (Downtown overflow and Miner's Field) <br />Staff Recommendations: <br />Staff recommends approval of the requested rezoning, final plat, final PUD, and SRU for DELO <br />Plaza, with the following conditions prior to recordation of the plat: <br />1. The City and the applicant shall develop a shared parking agreement for the private <br />surface parking lot for events at Miners' Field and larger downtown special events. <br />2. All signs, including any monument sign, shall comply with Chapter 7 of the CDDSG, as <br />well as Section 17.24 of the LMC, including a 10 foot setback from right-of-way. <br />3. The applicant shall continue to work with Public Works on addressing the comments <br />shown in the February 11, 2015 memo. <br />4. The proposed sidewalks shall match the sidewalk design included in the Highway 42 <br />Plan. <br />5. Because the Hwy 42 sidewalk is required, the applicant shall modify the landscape <br />sheets prior to recordation to remove the parking stalls, located along Highway 42, and <br />be replaced with landscaping in compliance with the MUDDSG. The applicant shall also <br />include an east/west sidewalk, connecting Highway 42 to the larger commercial building, <br />via a sidewalk located within a landscape island. <br />6. Staff requests the applicant preserve as many of the existing trees as possible. The <br />applicant shall work with the City Forester and Parks Project Manager, at time of <br />construction drawings, to determine which trees may be preserved. <br />Commission Questions of Staff. - <br />Moline asks whether the parking agreement lock in the location in the plat. He is concerned that <br />there will not be enough commercial surrounding the Woonerf. <br />McCartney answers affirmative. There are 79 parking spaces and it was chosen primarily for its <br />connectivity to the South Street Underpass and proximity to Downtown. <br />Russ says that during the negotiation of the site, Staff agreed with you, and wanted it to be in <br />turn an asset for more intense development. The landowner refused and this is the settlement, <br />and the only solution Staff could get. <br />Brauneis talks about the back of the building with a drive alley facing the parking area and the <br />Woonerf. To activate a space and be pedestrian -oriented, he does not see it. <br />McCartney says there is a landscape buffer between the back of the building to the parking <br />area. It is fairly thick with dense trees. <br />Moline asks why the parking and the street need the MUR designation. <br />McCartney says the zoning establishes it. <br />Russ says the "hatching" on the diagram represents ground floor retail within the MUR as <br />mandatory. <br />Moline says that the commercial/retail on the first floor, residential bring above it and adjacent to <br />the road, he found this appealing. He is concerned it has become parking. <br />