My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Minutes 2016 03 10
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2016 Planning Commission Agendas Packets Minutes
>
Planning Commission Minutes 2016 03 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 1:31:42 PM
Creation date
7/9/2020 11:37:46 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
3/10/2016
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />March 10, 2016 <br />Page 6 of 20 <br />South Boulder Road and located forward. The traffic study shows the commercial is an <br />acceptable level of service for what we are proposing. Parking for Buildings 1, 2, and 3 will be <br />parked below. The proposal meets the requirements for the PUD and the ratios for the <br />commercial and retail. The sidewalks and pedestrian circulation throughout the neighborhood <br />includes an outdoor plaza/gathering area formed between Buildings 2 and 3. Building 7 on the <br />corner has an outdoor area on the south side suitable for a brewery or similar use. Between the <br />commercial and the residential, a lane will create an urban edge instead of having a "back side" <br />to the commercial. There will be more windows and a pedestrian feel, and is multi -sided for the <br />pedestrian experience. The residential buildings will have elevators and adds to housing need <br />and diversity. Building 4 and Building 5 will have varied roof forms and glass. <br />Michael Markel, Markel Homes, 5723 Arapahoe Avenue #213, Boulder, CO <br />We have been working with the City of Louisville for over 10 years on North End. The good <br />news is this is the last block of North End. We have accomplished a lot of different goals. We <br />started out in 2007 and decided on a certain amount of units. Markel has proposed some <br />adjustments and changes over the years. With the economy in 2007- 2008, the homebuilding <br />business was in a depression. We are now in an upswing and feel fortunate to be a survivor of <br />that particular recession. We need to adjust to the general economy and what the demand is for <br />the marketplace. We also need to adjust to the demand within the community. For Louisville, we <br />have accomplished a lot of goals. We have a passion for creating products that are unique to <br />each town. The units at North End are not built in any other community. We are product -driven <br />and market -driven, not accounting -driven. This project works as the last piece of North End <br />because on the commercial side, the site is too small to be a big anchored center and it's too <br />big to be successful as a neighborhood service -oriented commercial area. We decided to go in <br />this direction because our consultants and our own studies showed building the neighborhood <br />commercial, having visibility from South Boulder Road, and providing housing not available in <br />Louisville is beneficial. There are a couple housing segments that are difficult to target for <br />developers. Moderately -priced condominiums for 55+ and an older segment of the population <br />are difficult to build. That is why we are asking for some additional units. I think they are needed <br />in the community. In the first phase in this commercial area, I am moving my company from <br />Boulder to Louisville in the first building. We have a craft brewery willing to build a small tasting <br />area in Building 7. I think we have a good idea here to create a successful commercial area. I <br />hope you will approve this. <br />Commission Questions of Applicant: <br />Moline asks Markel to describe in more detail the orientation and treatment of the back sides of <br />the commercial, retail, and office buildings. <br />Markel says we anticipate the businesses to be neighborhood -type services and deliveries to <br />be made by vans and smaller vehicles. The retail would be a "double -sided" through unit with a <br />front door and a back door that will be nicely detailed. We think these businesses will be more <br />vibrant because there is good access, especially with the traffic signal one-half block away, and <br />South Boulder Road visibility. <br />Brauneis asks if any units are built for wheelchair accessibility. <br />Markel says yes, all residential buildings and commercial buildings will be elevator accessible. <br />The majority of the units will be beyond ADA compliance. <br />Brauneis asks about the challenges of building condos, whether it is the market climate or the <br />legal climate within the State of Colorado. How are you able to do it? <br />Markel says we are building the most affordable residential product in Louisville. The first <br />building is sold out and the second building is almost sold out. We are able to provide good <br />quality products, good floorplans, and they are well -priced. We feel confident we will not run into <br />legal conflict. <br />
The URL can be used to link to this page
Your browser does not support the video tag.