My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Building Code Board of Appeals Agenda and Packet 2020 07 23
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
BUILDING CODE BOARD OF APPEALS
>
2020 Building Code Board of Appeals Agendas and Packets
>
Building Code Board of Appeals Agenda and Packet 2020 07 23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 10:34:16 AM
Creation date
7/20/2020 12:15:00 PM
Metadata
Fields
Template:
City Council Records
Meeting Date
7/23/2020
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JOB REVIEW <br />• New Roof - Unfinished <br />i. Building permit issued----------------------------------------- <br />ii. Began shingle removal <br />iii. Mid -roof inspection ordered June 181h 2019 Inspection approved -------- <br />iv. Experienced second hail storm without shingles; paper only---- <br />1. Note: Only Paper on Roof..... for 62 days <br />v. Began shingling roof ------- —__--_________________—__—�_---__ <br />vi. Final inspection ordered August 191h Final approved ----- -------- ---�____. <br />vii. Finished work is unacceptable <br />viii. Hired roof inspector (see report) <br />• Issued 2nd check of $5,006.55 to begin Gutters, Siding and Deck <br />October 31, 2018 <br />June 6, 2019 <br />June 19, 2019 <br />July 6, 2019 <br />August 11, 2019 (approx) <br />August 20, 2019 <br />January 7, 2020 <br />November 7, 2019 <br />• New Gutters (no downspouts) -Unfinished <br />I. Colorado Seamless Gutters of LafayetteDecember 4, 2019 <br />ii. Finished work is unacceptable (see inspector's report) <br />• Repair Siding - Unfinished <br />I. Committed to start siding --- ----- ------------------- ------ ----- ------------ November 16, 2019 <br />ii. Material delivered ------------ --------------------------------- November 20, 2019 <br />iii. Started job 34 days later ------------------------------ ------ December 20, 2019 <br />iv. Worked 2l", 22"d, 23`d, and 27"in the cold and dark <br />v. Finished work is unacceptable (see inspector's report) <br />• Replace Deck Planking - Unfinished <br />i. Estimated 2 weeks to complete <br />ii. Began removing deck planks, rails, stairs --------______—__—_ r____ November 14, 2019 <br />iii. Severy emailed deck material order for review and signature------ November 21, 2019 <br />1. Quantities grossly inaccurate <br />2. Contacted supplier; verified material was 3x more than needed <br />3. Order was not signed <br />iv. Railings and Posts were to be reused; damaged in removal <br />v. Debris removal from deck ------------ ------ ---------------------- December 29-31, 2019 <br />vi. Deck is currently half dismantled and a safety hazard <br />• New Window Screens— repaired and paid by me <br />• Repair Landscape Lights — repaired and paid by me <br />0 Replace Metal Trim on awning— repaired and paid by me <br />
The URL can be used to link to this page
Your browser does not support the video tag.