Laserfiche WebLink
2. SCOPE OF PROJECT <br />A. Final Design. PROJECT shall include the final design of improvements in accordance with <br />the recommendations defined in PLAN. Specifically, the final design of facilities shall <br />extend from approximately Garfield Avenue, as shown on Exhibit A. <br />B. Right -of -Way Delineation and Acquisition. Right-of-way for the improvements as set forth <br />in the final design and an estimate of costs for acquisition shall be determined. Maps, parcel <br />descriptions, and parcel plats shall also be prepared. <br />C. Construction. PROJECT shall include construction by DISTRICT of the drainage and flood <br />control improvements as set forth in the final design and vegetation establishment. <br />3. PUBLIC NECESSITY <br />PARTIES agree that the work performed pursuant to this Agreement is necessary for the health, <br />safety, comfort, convenience, and welfare of all the people of the State, and is of particular benefit <br />to the inhabitants of PARTIES and to their property therein. <br />4. PROJECT COSTS AND ALLOCATION OF COSTS <br />A. PARTIES agree that for the purposes of this Agreement PROJECT costs shall consist of and <br />be limited to the following: <br />1. Final design services; <br />2. Delineation, description and acquisition of required rights-of-way/easements; <br />3. Construction of improvements; <br />4. Contingencies mutually agreeable to PARTIES. <br />B. It is understood that PROJECT costs as defined above are not to exceed $862,806.55 without <br />amendment to this Agreement. <br />PROJECT costs for the various elements of the effort are estimated as follows: <br />ITEM <br />AMOUNT <br />1. Final Design <br />$ <br />200,000.00 <br />2. Right-of-way <br />$ <br />0.00 <br />3. Construction <br />$ <br />662,806.55 <br />4. Contingency <br />$ <br />0.00 <br />Grand Total <br />$ <br />862,806.55 <br />This breakdown of costs is for estimating purposes only. Costs may vary between the <br />various elements of the effort without amendment to this Agreement provided the total <br />expenditures do not exceed the maximum contribution by all PARTIES plus accrued <br />interest, if applicable. <br />C. At the request of CITY and DISTRICT, the following funds may be transferred to PROJECT <br />from a separate special fund held by DISTRICT: <br />Agreement No. 20-02.26 2 <br />