My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2021-12
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2021 Resolutions
>
Resolution 2021-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2024 3:12:27 PM
Creation date
3/17/2021 11:38:32 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
IGA Boulder County and Lafayette_104th St Trail Connection 2021
Meeting Date
3/16/2021
Doc Type
Resolution
Ord/Res - Year
2021
Ord/Res - Number
12
City Property Name
Trails
Cross-Reference
104th Street Trail Connection
Amendment 1 updates funding - Resolution 2022-27
Amendment 2 changes completion date to 12/31/2023
Original Hardcopy Storage
9C5
Record Series Code
45.160
Record Series Name
Resolutions
Supplemental fields
Budget Number/Name
PAVEMENT BOOSTER PROGRAM
Year Project
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Lafayette: From Coal Creek Trail to SH 42 <br />City of Louisville: From to SH 42 to south of NW Pkwy vehicle bridge <br />Boulder County: From south of NW parkway vehicle bridge to Rock <br />Creek Trail <br />A. Trail corridor maintenance shall follow the maintenance standards of the agency <br />responsible for the trail section and shall include: <br />1. Mowing the trail corridor. <br />2. Weed control of noxious and nuisance plants. If local agency herbicide <br />restrictions do not allow for successful control of state listed noxious weeds, <br />then Boulder County shall assist with weed control efforts. <br />3. Reconditioning or minor resurfacing of the trail as needed. <br />4. Drainage upkeep including cleaning culverts, concrete pans, and maintaining <br />cross slope. <br />5. Removal of trash and debris along trail corridor. <br />6. Removal of hazard limbs and trees. <br />7. In general this regional trail will only be snow -plowed on hard surfaces to <br />remove major blockages or obstructions resulting from road plowing. <br />B. Maintenance access for the entire trail corridor is permitted for day-to-day maintenance <br />activity. <br />C. Contractor access, trail closures, and race/public events with participation greater than <br />twenty five individuals are subject to review and approval by all the Parties. <br />D. Shall future amenities be desired, the location, standards, procurement and maintenance <br />of those amenities should be mutually agreed upon by the Parties. <br />8. Capital Maintenance Costs. For the purpose of the Agreement, capital maintenance cost <br />are defined as costs at or exceeding $5,000. These costs shall be shared by the Parties <br />consistent with the Open Space property ownership Intergovernmental Agreement, with <br />a 33%/33%/33% split among the Parties. Funds shall be requested a year in advance for <br />budgeting planning purposes. <br />9. Trail Use Reaulations and Non -Motorized Bicvcle and Pedestrian Public Access. The Parties <br />agree that the Connector Trail will be open to the public for bicycle and pedestrian use. <br />Equestrian and electrical assisted bicycle or "e-bike" use will be determined by each Party <br />within the area under their management control, and agreed upon by the Parties. The <br />Connector Trail shall be open 24 hours a day, 7 days a week. The County shall have authority <br />to enforce the Rules and Regulations for Parks & Open Space Areas in areas of the corridor for <br />the Connector Trail in unincorporated Boulder County. Louisville and Lafayette shall have <br />authority to provide regulatory enforcement pursuant to the ordinances of those cities. <br />10. Hold Harmless Responsibilities. The Parties are responsible for their own acts and agree to <br />hold the other Parties harmless for their acts. <br />11. Compliance with Grant Requirements. The Parties agree to comply with the applicable <br />provisions of the Grant, which is attached hereto as Exhibit C. <br />A. ENTIRE AGREEMENT: AMENDMENTS. This Agreement contains the entire <br />agreement between the Parties related to the Connector Trail. It may be amended only by <br />5 <br />DocuSign Envelope ID: FAOB590D-1B04-4350-AAE4-D32E52Dlc61B <br />
The URL can be used to link to this page
Your browser does not support the video tag.