Laserfiche WebLink
City of Louisville - Department of Public Works Engineering Division <br />Underpass Conceptual Designs - Engineers Opinion of Probable Cost Ki mley <br />South Boulder Road & Main Street - School Side Path Date: <br />KH Project Number: 096489003 Prepared By: <br />Project Number: Checked By: <br />>» Horn <br />6/17/2021 <br />AP <br />MEC <br />DETAILED CONSTRUCTION BID <br />ITEMS <br />ITEM NUMBER <br />ITEM DESCRIPTION <br />UNIT <br />COST <br />QUANTITY <br />AMOUNT <br />201-00000 <br />Clearing and Grubbing <br />LS <br />$ 5,000 <br />1 <br />$ 5,000 <br />202-00200 <br />Removal of Sidewalk <br />SY <br />$ 30 <br />720 <br />$ 21,600 <br />202-00220 <br />Removal of Asphalt Mat <br />SY <br />$ 9 <br />360 <br />$ 3,240 <br />202-05030 <br />Sawing Asphalt Material (10 Inch) <br />LF <br />$ 8 <br />1,080 <br />$ 8,640 <br />304-06007 <br />Aggregate Base Course (Class 6) <br />CY <br />$ 55 <br />250 <br />$ 13,750 <br />608-00026 <br />Concrete Bikeway (6 Inch) <br />SY <br />$ 70 <br />1,440 <br />$ 100,800 <br />609-21020 <br />Curb and Gutter Type 2 (Section II-B) <br />LF <br />$ 36 <br />1,080 <br />$ 38,880 <br />DETAILED CONSTRUCTION BID ITEMS (SUBTOTAL) (A) <br />$ 191,910 <br />GENERAL CONSTRUCTION BID ITEMS <br />ITEM NUMBER <br />ITEM DESCRIPTION <br />% RANGE <br />% USED <br />COST <br />Construction Stormwater Management (Erosion Control/SWMP) <br />3%-10% of (A) <br />5% <br />$ 9,600 <br />Drainage/Water Quality <br />3%-10% of (A) <br />3% <br />$ 5,800 <br />Landscape and Irrigation Restoration <br />1%-15%of(A) <br />10% <br />$ 19,200 <br />Signing and Striping <br />1 %-5% of (A) <br />3% <br />$ 5,800 <br />Utilities <br />3%-10% of (A) <br />5% <br />$ 9,600 <br />$ - <br />GENERAL CONSTRUCTION BID ITEMS (SUBTOTAL) (B) <br />$ 50,000 <br />CONSTRUCTION BID ITEMS (TOTAL) (C) <br />$ 241,910 <br />CONSTRUCTION ALLOWANCES <br />Force Account (Utilities) <br />1%-2% of (C) <br />1% <br />$ 2,500 <br />Force Account (Misc.) <br />10%-15% of (C) <br />15% <br />$ 36,300 <br />Construction Engineering, Management, and Survey <br />5%-25% of (C) <br />10% <br />$ 24,200 <br />Temporary Traffic Control <br />5%-25% of (C) <br />5% <br />$ 12,100 <br />Mobilization <br />5%-10% of (C) <br />10% <br />$ 24,200 <br />CONSTRUCTION ALLOWANCES (D) <br />$ 99,300 <br />TOTAL CONSTRUCTION COST (E) (C + D)A $ 341,210 <br />DESIGN, CONTINGENCIES, AND ROW <br />'Design <br />Engineering (City, Consultant, Subconsultants) <br />5%-30% of (E) <br />10% <br />$ 34,200 <br />Contingencies <br />(15%-50%) of (E) <br />50% <br />$ 170,700 <br />DESIGN, CONTINGENCIES, AND ROW (SUBTOTAL) (F) <br />$ 204,900 <br />PROJECT TOTAL (2021) (E + FA $ 546,110 <br />ESCALATION (5%) <br />PROJECT TOTAL (2022) <br />$ 573,416 <br />PROJECT TOTAL (2023) <br />$ 602,086 <br />PROJECT TOTAL (2024) <br />$ 632,191 <br />PROJECT TOTAL (2025) <br />$ 663,800 <br />Assumptions <br />It is assumed that no retaining walls/structures are necessary behind back -of -walk. <br />The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market <br />conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design <br />professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its <br />opinions of probable costs. <br />https://kimleyhorn.sharepoint.com/sites/MT_Denver_SurfaceTransportation/Shared Documents/Louisville Underpass Concepts/20210615 - Louisville Underpass <br />Concepts - Cost Estimate.xlsx <br />