My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 2021 06 17 SP
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
2021 City Council Minutes
>
City Council Minutes 2021 06 17 SP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 3:15:47 PM
Creation date
8/2/2021 9:58:21 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
6/17/2021
Doc Type
City Council Minutes
Original Hardcopy Storage
9C1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council <br />Meeting Minutes <br />June 17, 2021 <br />Page 2 of 5 <br />Mayor Stolzmann read the proclamation. Councilmember Dickinson stated the City will fly <br />the Juneteenth flag this weekend in two locations. <br />Vote: All in favor. <br />DISCUSSION/DIRECTION - UNDERPASS COST ESTIMATES & <br />PRIORITIZATION, FINANCIAL CONSIDERATIONS, AND POSSIBLE <br />BALLOT LANGUAGE FOR POTENTIAL TRANSPORTATION TAX <br />City Manager Balser stated the goal of the discussion tonight is for Council to prioritize <br />the list of possible underpasses and determine a dollar amount to include in the ballot <br />issue for residents' consideration. <br />Director Kowar noted the presentation shows six underpasses at roughly 10% design and <br />includes estimates for the cost for each of those. Cost estimates include right-of-way, land <br />costs, and other improvements. Staff also added a 50% contingency number and shows <br />costs for inflation depending on when they are built. <br />Director Kowar reviewed each of the underpass designs and costs. <br />The Main Street and South Boulder Road with design with contingency costs is estimated <br />to be $19.8M. <br />Hwy 42 & South Street is estimated at $9M with contingency costs. This design includes <br />upgrades to the larger area and would close one block of Spruce Street to traffic. <br />Members noted some concerns about the traffic changes. <br />Mayor Stolzmann noted that design details will be decided on later after a full process <br />including input from residents and boards. <br />Via Appia and South Boulder Road is estimated at $4M with contingency costs. Director <br />Kowar noted this design is meant to be a regional trail connection and does not line up <br />with the intersection and transit. <br />Bullhead Gulch is in a new location is estimated at $5.8M. The new location is in line with <br />the trail coming from the Hwy 42 underpass. <br />Dillon Road and the Powerline Trail is estimated at $9.6M and includes paving the trail all <br />the way to the US 36 Bikeway. <br />South Boulder Road and Hwy 42 is estimated at $5.4M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.