Laserfiche WebLink
<br />2a. 96.h Street (Hwy 42) Crossing or Underpass. This would be beneficial in <br />the regional trail connections mentioned in #2. Cost estimate: $20,000 to <br />$500,000 <br /> <br />2b. Underpass for the Burlington Northern and Santa Fe Railroad Tracks. <br />This would be beneficial to the connections mentioned in #2. Cost estimate: <br />$500,000+ <br /> <br />Slatl/s: Undelpasses are olltside the nmding scope of Boulder CO\Ulty Parks and Open Space CIP. <br /> <br />3. Davidson Ditch connection between Davidson Mesa & North Open Space: <br />This trail would connect the Davidson Mesa trails system with the North Open <br />Space trail system following the <br />Davidson Ditch. Regionally, this <br />trail would connect proposed trail <br />recommendation number four <br />(Callahan to City of Boulder) <br />with proposed trail <br />recommendation number six <br />(Davidson Mesa/Coal Creek to <br />Marshall Mesa). The City of <br />Boulder Open Space and <br />Mountain Parks has been <br />contacted about this project <br />however, further discussion <br />needs to occur to determine their <br />position regarding passive <br />recreation and future partnering at this location. <br /> <br /> <br />-L'.I <br />. J <br />.. ~~~:tR~~~ - ' <br /> <br />SI(I(I/s: Boulder County does not own any of the IUlderlying propClty required for this trail and <br />therefore \"iews tlus as a joint project between Louis\"ille and the City of Boulder. <br /> <br />4. Callahan & Burlington Northern Railroad: The purple trail represents a <br />conceptual not actual trail alignment along the Burlington Northern Rail Road. <br />This concept was supported <br />in both the Boulder Valley <br />Comprehensive Plan and the <br />Boulder County <br />Comprehensive Plan. In the <br />future this trail connection <br />could potentially connect the <br />City of Boulder to Louisville, <br />Lafayette and Superior. <br /> <br /> <br />I <br /> <br />l3b1e~ <br /> <br />I <br /> <br />. <br /> <br />" <br />,i <br />'- <br />G <br />I' <br />.1 <br />~,' ~ .. . - . <br /> <br />~.II./ .. <br /> <br />.... -..... <br /> <br />l <br /> <br />I <br /> <br />. <br /> <br />.' <br />-.'/ <br /> <br />Slnllls: Boulder County does not ha\"e any plans for completion of tlus trail cOlUlection at this <br />time. <br />