My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 1997 05 06
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
1990-1999 City Council Agendas and Packets
>
1997 City Council Agendas and Packets
>
City Council Agenda and Packet 1997 05 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:23:37 PM
Creation date
11/13/2009 10:08:12 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Signed Date
5/6/1997
Original Hardcopy Storage
5A1
Supplemental fields
Test
CCAGPKT 1997 05 06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Levihn moved that Council pass this onto the Planning Commission with Council comments, <br />seconded by Howard. All in favor. <br />DISCUSSION/DIRECTION VINTAGE REAL ESTATE SERVICES PRELIMINARY <br />SUBDIVISION PLAT AND PUD <br />Paul Wood, Planning Director, explained that Vintage. Real Estate Services would be representing <br />Wol -Shing Shiao, property owner of the 4.73 acre parcel located immediately west of McCaslin <br />Boulevard and south of Century Office Park. The property is zoned Commercial- Community (CC). <br />This submittal was based upon preliminary documents submitted under the name of The Thompson <br />Subdivision (name later changed to Century Retail) and reviewed by City Council as a <br />discussion/direction item July of 1996. This proposal was being resubmitted at the preliminary level <br />to subdivide the property into two lots and revise the drive -thru relative to its visibility from McCaslin <br />Boulevard. The plat did not include any dedication of open space, which would yield 24,766 s.f. or <br />.57 acres. The revised PUD reflected a total of 33,150 s.f organized into three rather than four retail <br />pads. The restaurant pad, proposed as Boston Market, would be 3,000 s.f with the drive -thru being <br />fully screened from McCaslin. Landscape coverage was proposed at 35% and a minimum 50' setback <br />from McCaslin, which would function as a detention pond. Staff did not support the 29" letter height/ <br />on the proposed signs or glossy, metal awnings on Boston Market. <br />Davidson called for the applicant's presentation. <br />Rebecca (Becky) D. Martin, 2870 No. Speer Boulevard, Denver, CO 80211, representing Wol -Shing <br />Shiao, pointed out that they redesigned the parking area; 1) removed the ATM so the stacking <br />allowed for 10 cars at the drive -thru; 2) provided a 36" high retaining wall and landscaping providing <br />a double buffer zone of the drive -thru area, so as not to be seen from McCaslin; 3) enlarged the <br />pedestrian gathering areas for both Boston Market and Einstein Bagels; 4) shielded both from the <br />drive -thru and; 5) removed the bridge at the center of the development so pedestrians would not be <br />encouraged to walk through. <br />Paul Trementozzi, OZ Architecture, Boulder, Colorado, reviewed a computer prospective of the site <br />as he discussed the drive -thru and project in general. <br />Tim McDougal, Developer, Greenwood Realty, 5701 South Ash Street, Greenwood Village, <br />Colorado 80121, stated that his proposal would be to do the development of the front piece, both <br />Boston Market and the 7,000 s.f building for Einstein Bagels, Starbucks Coffee, and a third tenant. <br />John Hauser, real estate representative for Einstein Bagels and Boston Market in Colorado, was there <br />to answer questions. <br />Davidson called for Council comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.