My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 1997 05 06
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
1990-1999 City Council Agendas and Packets
>
1997 City Council Agendas and Packets
>
City Council Agenda and Packet 1997 05 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:23:37 PM
Creation date
11/13/2009 10:08:12 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Signed Date
5/6/1997
Original Hardcopy Storage
5A1
Supplemental fields
Test
CCAGPKT 1997 05 06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
approved, there were certain representations made during that process having to do with the elevation <br />of the parking lot in relation to the elevation of McCaslin Boulevard, screening of cars and headlights <br />between McCaslin Boulevard and the parking lot and a 35' setback from McCaslin Boulevard. He <br />asked the applicants to compare and contrast their proposal to those representations and the approval <br />of the overall development plan. He wanted Planning Commission to take a particular look at that. <br />Dan Blankenship, Bucher, Willis Ratliff Corporation, 1743 Wazee Street, Ste. 200, Denver, <br />Colorado, stated that the parking lot is higher than McCaslin. He pointed out that there is a <br />significant amount of landscaping being proposed between the parking lots and McCaslin. He <br />reviewed the site plan. <br />Howard moved that Council send Lot 1 to the Planning Commission with Council comments, <br />seconded by Mayer. All in favor with Sisk and Lathrop being excused. <br />LOT 2 <br />Wood stated that Lot 2, RiteAid Corporation is proposing a 14,286 s.f building for a pharmacy and <br />foodmart with lot coverage at 22 Open space at 28% incorporated the hard surface areas, which <br />concerned Staff. Accessory to the building is a two lane drive -thru along the rear or west elevation <br />of the building. The finished elevation of the building is proposed at 5,472.3 which is about 2' higher <br />than Lot 1 and about 7' higher than McCaslin Blvd. No detail had been provided to show how <br />rooftop HVAC units would be screened. Five sign areas were outlined on three building elevations, <br />but no detail as to type and area of sign letters (no monument signs requested). The front parking <br />lot encroached into what had been maintained as a 35' minimum landscaped setback between the <br />adjacent parking lots and McCaslin Boulevard, which would be the location of the detention ponds. <br />for L 1. As a result the detention area in front of Lot 2 would be compressed in width requiring a <br />retaining wall system to be dropped down into the detention facility. ft was staff's position that the <br />parking lot would not be fully screened from McCaslin Boulevard. Maintaining the parking lot to a <br />point that provided additional landscaping area at the same elevation as the parking lot to McCaslin <br />was an important issue for staff. Staff wanted the box -like appearance of the building broken up with <br />additional building articulation, roof overhangs, and additional landscaping adjacent to the north and <br />east building elevations. The PUD should provide additional information on site/building lighting, <br />signage and trash dumpster locations, including enclosure. <br />Davidson called for the Lot 2 applicant's presentation. <br />Donald Slack, SEM Architects, 'Inc., 7935 E. Prentiss, Suite 102, Englewood, Colorado 80111, <br />reviewed the site. <br />Davidson called for Council questions. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.