My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2009 10 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2009 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2009 10 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:49:45 AM
Creation date
11/23/2009 10:27:53 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2009 10 08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The applicant has revised the plans to include the following changes; <br /> Building 1 has been split into two separate 18,825 square foot buildings (Building 1A <br />and 1B). The eastern façade of both of these buildings is 240 feet in length. The <br />previous application showed one 40,200 square foot building with a 510 foot façade. <br />The plan cover sheet has been modified to reflect this change as it affects the <br />building square footage calculations and the parking ratios. <br /> An additional water line, sewer line, and fire sprinkler water line have been added to <br />the utility plan to service the additional building. Condition of approval #2 has been <br />modified to include the presence of two water lines. <br /> A pedestrian plaza/employee break area has been added between the two new <br />buildings. The break area is 70 feet wide at the entrance, and then narrows to 30 <br />feet on the interior. The western end of the break area is enclosed with two 13 foot <br />high walls that screen it from the loading and parking area. <br /> The landscaping on the western edge of the property that was originally shown on <br />the adjacent property has been moved completely onto Lot 12. As a result of this <br />change, the condition of approval associated with moving the landscaping <br />completely onto Lot 12 has been removed from staff’s recommendation. <br />The remainder of the plan remains unchanged. The staff report from the initial hearing has <br />been included in the commissioner’s packets for reference. <br />STAFF RECOMMENDATION: <br />Staff recommends approval of the Final PUD Development Plan for the development of one <br />40,200 square foot flex office building and two additional 18,825 square foot flex office <br />buildings located at 739 S 104th Street on Lot 12 of the Colorado Technological Center <br />Subdivision, Filing 2, with the following conditions: <br />1. Prior to City Council approval the applicant will obtain a deed of easement from the <br />owners of Lot 13 of the Colorado Technological Center Subdivision, Filing 2 to <br />construct improvements including a drainage culvert and rip rap on Lot 13. The <br />development agreement will indicate that maintenance of these drainage <br />improvements will be the responsibility of the owner of Lot 12. These documents <br />will be recorded with the Boulder County Clerk and Recorder. <br />2. The development agreement will contain language outlining the responsibility of the <br />owner of Lot 12 to operate and maintain the two City owned but privately maintained <br />waterlines shown on the plans. <br />3. Prior to City Council approval the applicant will dedicate the utility and access <br />easement shown on the utility plan to the City of Louisville. <br />G:\Planning Commission\2009\Pasco_CTC_Lot_12\continued_08-023--FP_Passco_PC Staff Report 100809 <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.