410 410 <br /> 7/19/84 Page -7- <br /> adaptable to a 4WD once they get on line. <br /> The schedule was to be August 1st and <br /> have water by June 1, 1985. He referred <br /> to the chart that was provided Council and <br /> stated they would be working with Louisville <br /> Associates on a parallel status with the City. <br /> They will bring their project team with the <br /> members of the Engineering staff of the City, <br /> and a contractor to make this work as a team. <br /> It is their plan to have the operators of <br /> the utilities work with them on the first de- <br /> sign before they present it to the City. To <br /> expedite the process they will go through the <br /> state review. Mr. Smades stated that they <br /> could save about 2 months time through the <br /> proposal, bid stages, and the necessary legal- <br /> ities that the City would have to go through. <br /> There will be 2 teams - the design team and <br /> the construction team. They had talked with <br /> the contractors or would speak with those <br /> who would be agreeable with the City, to meet <br /> the schedule. The State reviews would take <br /> place during the construction process. He <br /> depicted on a wall map the location of the <br /> 2M DG site then would increase this to the <br /> 4MDG site. Mr. Smades stated this technique <br /> was the latest one used all over the world <br /> Schedule for water treatment. The schedule was to <br /> start August 1st with the team members and <br /> the design program - start the final plant <br /> design in September and have it done in <br /> December. Construction will begin in December <br /> putting in roads and starting some of the <br /> concrete work. The cost that they were com- <br /> fortable with was presented to Council in <br /> their packet. He reiterated that it had <br /> to be team work or the schedule would not <br /> be met. That it why they were asking for <br /> City staff to have input as far as operation, <br /> so the City will have its plans sat for opera- <br /> tion, manpower increases and scheduling for <br /> next summer. <br /> In reply to Mayor Meier's question, Mr. Smades <br /> stated that they have not done a 2HGGD treat- <br /> . <br /> sent plant on a fast track; however stated <br /> that they witl have a person from Phonenix <br /> on their fast track team, who will do the <br /> instrumentation controls, and electrical work. <br /> He has just finished a 240 MCD treatment plant <br /> in ten months at the Union Hills Plant in <br /> Phoenix. The only element they have to fear <br /> is the weather. <br />