Laserfiche WebLink
COUNCIL COMMUNICATION <br />TO: MAYOR AND CITY COUNCIL <br />FROM: WILLIAM A. SIMMONS, CITY MANAGER <br />DATE: September 13, 2004 <br />SUBJECT: US /36 Interchange - Interim Improvements <br />ORIGINATING DEPARTMENT: Public Works Department <br />SUMMARY: <br />Given the delay in the McCaslin Blvd. Interchange project the Town of Superior initiated an <br />investigation as to possible interim improvements to help with traffic operations during the coming peak <br />holiday season. The nature of the interim improvements would include removal of the existing concrete <br />median, miscellaneous asphalt repairs on the bridge deck, removal of some curb gutter and medians on <br />McCaslin and related work. This would provide for six lanes on the bridge and three lanes onto the <br />bridge from both Superior and Louisville. At Monday night's study session Public Works staff and the <br />traffic engineering consultant working with Superior on the interchange will be present to discuss the <br />traffic operations with interim improvements. The traffic engineering consultant, Alex Arenello with <br />Leigh, Scott & Cleary, will also provide a visual simulation of traffic operations. At this point staff from <br />Superior and Louisville favors the option with two through lanes and one left turn lane in each direction. <br />Attached is an initial analysis of traffic operations for the interchange with different lane configurations, <br />as noted. <br />Superior's staff has reviewed the agreement with their Town Attorney and will present the agreement to <br />their Town Board on Monday, September 13, 2004 for their approval. <br />SUBJECT <br />US /36 Interchange- Interim Improvements <br />AGENDA ITEM <br />1 <br />