My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Centennial Valley Parcel O Filing 7 Lot 2 Amendment PUD Mylar
PORTAL
>
RECORDED PLATS (Mylars) and CITY MAPS
>
PUD (Planned Unit Developments)
>
C
>
Centennial Valley Parcel O
>
Centennial Valley Parcel O Filing 7 Lot 2 Amendment PUD Mylar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 2:28:14 PM
Creation date
3/26/2024 1:30:52 PM
Metadata
Fields
Template:
CITYWIDE
Also Known As (aka)
550 McCaslin Commercial Condominiums, Ascent Community Church
Doc Type
Mylar
Recordation Number
4041205
Subdivision Name
Centennial Valley Parcel O Filing 7
Signed Date
2/22/2024
Parcel Identification Number
157518358002
Parties Involved
550 McCaslin Holdings
Cross-Reference
Ascent Community Church
Sam's Club
Relish
Pickleball
Record Series Code
40.180
Record Series Name
Maps Drawings Plats Plans
Quality Check
3/19/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Boulder County, CO <br />04041205 <br />Page 5 of 32 <br />LOGO <br />20-086-002\2 drawings\ Plotted by Nicholas Date: 21 <br />47, <br />File: LOAC130DU.dwg Path: P: \Colorado\louisvili <br />e/ <br />w w w it" <br />• <br />w <br />w <br />I <br />I <br />-. 589* 54'` 4730 E <br />15- <br />w I w F <br />Nfr <br />8' CLEANOUT <br />RIM: 5465.13 <br />IE IN: 5461.06 8" S <br />IE OUT: 5461.06 B' E <br />I I I <br />Sj <br />GREASE INTERCEPTOR ill' <br />IE IN: 5460.98 8' W <br />1 � \ W V• <br />VVVVVVVVV VGVVVVVVYV VVVvVV <br />Q• nvv <br />• VVVVVVVV 9vV 4 VVVV Vv <br />• <br />V <br />VV V V V V V V V V <br />rvvvvvvv v �¢VVVVVVVVV <br />- 4. <br />I <br />4 _ 4 <br />5OLF'' SDR35 0 2.00X-' <br />rus <br />• <br />PROPOSED GREASE ` - <br />I ; INTERCEPTOR to <br />550 MCCASLIN PUD AMENDMENT <br />S Y2 SECTION 18, TOWNSHIP 1 SOUTH, RANGE 69 WEST, 6TH P.M. <br />CITY OF LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO <br />yes CONNECT TO MAIN <br />E IN: 5460.02 8" S <br />4.3 <br />w <br />r4 <br />CONNECT TO BUILDING- <br />IE OUT: 5462.06 B" N <br />SANITARY SEWER NOTES <br />1. ALL. CONSTRUCTION/INSTALLATION OF SANITARY SEWER MAINS SHALL BE DONE IN A SAFE, NEAT AND <br />PROFESSIONAL MANNER, AND UNDER SUPERVISION OF CITY FORCES AT ALL TIMES. ALL SAFETY <br />REQUIREMENTS FROM OSHA AND OTHER STATE REGULATORY AGENCIES MUST BE MET. <br />2. THE MINIMUM SIZE FOR PUBLIC SEWER MAINS SHALL BE B" DIAMETER. ALL SANITARY SEWER PIPING SHALL <br />BE SCHEDULE D3034 PVC OR EQUAL MINIMUM PIPE DIAMETER FOR PRIVATE LATERALS IS 4' AND OF <br />SCHEDULE D3034 PVC OR EQUAL ALL SANITARY SEWER LATERALS MUST BE PROPERLY MARKED AT ENDS. <br />3. CONNECTIONS INTO THE EXISTING SANITARY SEVER MAINS REQUIRE ISSUANCE OF PUBLIC WORKS PERMIT AND <br />INSPECTION BY THE LOCAL JURISDICTION PRIOR TO BACKFIWNG. <br />4. ALL NEW SANITARY SEWER PIPES AND MANHOLES MUST BE THOROUGHLY CLEANED, INSPECTED AM) <br />PRESSURE/VACUUM IESIU) AS REQUIRED BY UTILITY PROVIDER AND GOVERNMENTAL AGENCIES WITH <br />JURISDICTION. ALL JESTS MUST BE WITNESSED AND PASSED BY THE UTILITY PROVIDER AND GOVERNMENTAL <br />AGENCIES WITH JURISDICTION PRIOR TO PLACING INTO OPERATION. <br />5. THE CONTRACTOR SHALL PROVIDE TO THE UTIUTY PROVIDER ANY GUARANTEE OR WARRANTY NORMALLY <br />FURNISHED WITH THE PURCHASE OF ANY MATERIALS USED IN CONNECTION WITH THE PROJECT AT HAND. <br />4. 4 ' <br />A. <br />• • •..S <br />-GREASE INTERCEPTOR OUT: - ' • • <br />IE OUT: 5460 ; ; 8" E <br />PRIVATE DIVE <br />w' <br />s4' . <br />GENERAL UTILITY NOTES <br />1. ALL IMPROVEMENTS SHALL MEET LOCAL STATE DOT AND A.P.W.A. STANDARD SPECIFICATIONS. <br />2. REFER TO INTERIOR PLUMBING DRAWINGS FOR 11E-IN OF ALL UT1UTIES. <br />3. ALL FILL. MATERIAL SHALL BE IN PLACE, AND COMPACTED BEFORE INSTALLATION OF PROPOSED U11U11ES. <br />4. CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITES INSPECTORS 72 HOURS BEFORE CONNECTING TO ANY <br />DOSING UNE <br />5. MINIMUM WATER AND SANITARY SEWER TRENCH WDTH SHALL BE 2 FEET. <br />6. ALL UTILITIES SHOULD BE KEPT TEN (101 APART (PARALLEL) OR WIZEN CROSSING 18" VERTICAL CLEARANCE <br />(OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE). <br />7. IN THE EVENT OF A VERTICAL CONFECT BETWEEN WATERLINES, SANITARY ONES, STORM ONES AND GAS LINE <br />(DUSTING AND PROPOSED), TIE SANITARY UNE MALL BE DUCTILE IRON PIPE WITH MECHANICAL JOINTS AT <br />LEAST 10 FEET ON BOTH SIDES OF CROSSING, NE WATERLINE SHALL BE MECHANICAL JOINTS WITH APPROPRIATE <br />THRUST BLOCKING AS REQUIRED TO PROVIDE A MINIMUM OF 18" CLEARANCE, MEETING REQUIREMENTS OF ANSI <br />A21.10 AND ANSI A21.11 (AWWA C--151) (CLASS 50). <br />8. LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED AND APPROVED BEFORE BACKFIWNG. <br />9. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH THE SPECIFICATIONS OF THE LOCAL AUTHORITIES WLTH <br />REGARD TO MATERIALS AND INSTALLATION OF THE WATER AND SEWER LINES. <br />10. ALL NECESSARY INSPECTIONS AND/OR CERIIFICATICNS REQUIRED BY CODES AND/OR U11U1Y SERVICE COMPANIES <br />SHALL BE PERFORMED PRIOR TO ANNOUNCED BULDING POSSESSION AND THE FINAL CONNECTION OF SERVICE. <br />w ►� <br />. fr <br />••VVVV•VVVV VVVVVV VVVVV <br />VVVVVVVVVVVVVVVVVV' <br />VVVVVVVVVVVVVVVVVV <br />VVYVVVVVVVVVVVVVVV I.(VVVVVVVVVVVVVVVVA. <br />4 1- - <br />I VVVVVV vvvVVVVVV <br />VVVVVVVVVVVvvvvr <br />`` V V VVVp VVVFVVVVV VVVVVV••' <br />pppVVv <br />V4� V VVVV VVV VVVV VV V - i. <br />.n VVvS�vVVVVVVVVVV VV <br />VVVVV�VVVVVVVVVVVVV <br />V V V V VIKV V V V V V V V V V V <br />OVVVVVir..?vvvvvvvvvv <br />vvvvvvvvVvvvv <br />VVVVVV VVVVVVVVI■■`` <br />Ovvpvvv� Vvvvvv i1 <br />VVVVVVVVV VVVVVV\ <br />- : • VVVVV VVVVVVVVVV <br />V V V V V V V V V V V VVVVVVIA�VVVVVVV V V V VV <br />•• V V V v v v V v V v V V v v v v <br />VVVVVVVVVVVV'7' VVV <br />1 <br />w <br />11 <br />111.5 <br />r <br />wow <br />1 <br />3 3-4-2 <br />I <br />4- Y 4 <br />• <br />• <br />4• <br />'ter <br />`+� t <br />ALS <br />w <br />w <br />3 3 <br />W <br />I <br />/ 4 4-'i <br />/ . + <br />�i <br />/~-� ' ' <br />e- <br />N <br />4 • a' <br />• <br />• <br />11. CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND <br />SPECIFICATIONS. <br />12. CONTRACTOR TO PROVIDE TRENCHING, BACKFLL, 2 - 4" PVC SCHEDULE 40 CONDUITS, AND PUWNG WIRES FOR <br />UNDERGROUND TELEPHONE SERVICE FROM EXISTING FACILITIES AS SHOWN ON PLANS. CONTRACTOR TO <br />COORDINATE INSTALLATION AND POINT OF CONNECTION WITH UTLIIY PROVIDER <br />13. CONTRACTOR IS TO PROVIDE 1RENCHNG, CONDUIT, AND BACKFILL FOR ALL UNDERGROUND POWER UNE AND <br />VAULTS AS REQUIRED BY UTILITY PROVIDER. POWER LINES AND POLES TO BE INSTALLED BY U11UTY PROVIDER. <br />SEE SITE ELECTRICAL PLAN FOR SITE LIGHTING AND FOR PRIMARY ELECTRIC SERVICE LOCATIONS. <br />14. GAS PIPING SHOWN FOR COORDINATION ONLY. INSTALLATION OF THE GAS MAIN AND METER TO BE ACCOMPLISHED <br />BY UTILITY PROVIDER. <br />15. BACKFLOW PREVENTION DEVICES SHALL BE INSTALLED INSIDE NE BUILDING FOR EACH APPLICABLE USE <br />INCLUDING DOMESTIC, FIRE, AND RRIGATIONI SYSTEMS. CONTRACTOR SHALL COORDINATE AND SUPPLY A <br />BACKFLOW TEST REPORT TO THE WATER AND SEVER DEPARTMENT UPON INSTALLATION. OWNER IS REQUIRED TO <br />SUPPLY AN ANNUAL BACKFLOW TEST REPORT TO THE WATER AND SEWER DEPARTMENT. <br />w <br />T� <br />4.44 <br />• <br />• <br />• <br />• <br />w <br />ct) <br />• <br />• <br />li <br />LEGEND <br />.11111 1111 <br />w <br />SS <br />DUI <br />E <br />T <br />PROPERTY UNE <br />CURB AND GUTTER <br />FENCE <br />BUILDING SETBACK <br />PROPOSED BUILDING <br />WATER LINE <br />SEWER LINE <br />STORM UNE <br />GAS UNE <br />ELECTRIC LINE <br />COMMUNICATIONS UNE <br />SANITARY MANHOLE <br />a �o <br />1 inch - 10 ft. <br />RIDGETOP <br />ENGINEERING & SURVEYING <br />541 E. Garden Drive, T 653-4552 <br />Unit N W ridgeloperlg.corn <br />Windsor, Co 80550 <br />SEAL. <br />PROJECT TITLE <br />550 MCCASLIN <br />PUD <br />AMENDMENT <br />550 MCCASLIN BLVD <br />LOUISVILLE, CO 80027 <br />PREPARED FOR <br />ASCENT COMMUNITY <br />CHURCH <br />550 MCCASLIN BLVD <br />LOUISVILLE, CO 80027 <br />SUBMITTAL <br />PUD AMENDMENT <br />DRAWN BY: <br />CHECKED BY: <br />PROJECT NO.: <br />REVISIONS <br />REVISIONS <br />DATE <br />06/16/2023 <br />SHEET TITLE <br />KNW <br />MRB <br />20-086-002 <br />10/11 /2023 <br />UTILITY <br />SCHEMATIC <br />SHEET INFORMATION <br />C-3.0 <br />5 Of 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.