Laserfiche WebLink
Tenant Finish: The first tenant occupying a space(s) in a core and shell. <br />Multiple tenants may be considered as a tenant finish until the entire space <br />within the core and shell has had a tenant. Once a space within a core and shell <br />has been occupied it becomes an existing building. <br />4. C401.2. Commercial buildings shall comply with See fie. C40 .2.' one of the <br />following as applicable <br />C401.2.1 Performance targets. New commercial building types included in the <br />scope of Appendix PT shall comply with Appendix PT and Sections C403.2.4 <br />and C404.10. <br />C401.2.2 Core and shell. Core and shell buildings shall comply with the <br />provisions of Section C402.1.3 through C402.5. When mechanical systems are <br />installed, core and shell buildings shall also meet the provisions in C403.2.4, <br />C404.10, and Section C408. <br />C401.2.2.1 Core and shell buildings shall submit a letter of agreement to the <br />City stating the tenant spaces included in the scope of Appendix PT shall meet <br />the EUI target established in Table PT 103 and shall include these requirements <br />in their lease or purchase agreements. <br />C401.2.3 Tenant finish. Tenant finishes included in the scope of Appendix PT <br />shall comply with Appendix PT and C403.2.4 and C404.10. All other tenant <br />finishes shall comply with the Prescriptive Compliance option, which requires <br />compliance with Sections C401.3, C401.4, C402 through C406, and C408. <br />C401.2.4 Other commercial building types. Commercial building types not <br />included above, includinz additions, shall comply with the Prescriptive <br />Compliance option, which requires compliance with Sections C401.3, C401.4, <br />C402 through C406, and C408. <br />Exception: Additions, alterAlterations, repairs, and changes of <br />occupancy to existing buildings complying with Chapter 5. <br />5. Section C401.2.1 International Energy Conservation Code, is hereby deleted <br />and replaced to read as follows: <br />C401.2.1 International Energy Conservation Code <br />Commercial buildings shall be built all -electric unless the fuel gas options of <br />C403.3.2 and the additional electric infrastructure requirements of C405.14 are met. <br />All buildings must comply with the following: <br />Page 4 of 29 <br />