Laserfiche WebLink
A SAMPLING OF - WATER FUND CAPITAL or RELATED PROJECTS <br /> <br />Index: <br /> <br />I.) Water Facilities Infrastructure Plan -2011/2012 <br /> <br />II.) Utility Rate Study <br />th <br /> <br />III.)Transmission Waterline Construction (96 St. from Locke St. to Dillon Rd.) <br /> <br />IV.)Sludge Handling <br /> <br />V.) Flocculation/Sedimentation Basin Covers <br /> <br />VI.)Sedimentation Basin Rehabilitation <br /> <br />VII.)Southern Water Supply Pipeline Connection Expansion <br /> <br />VIII.)Howard Berry Water Treatment Facility Expansion <br /> <br />IX.)Marshall Lake Multi Level Outlet (2011 see Raw WQ Monitoring) <br /> <br />X.) Raw Water Quality Monitoring Plan -2011 <br /> <br />XI.)Real Time Distribution Water Quality Monitoring. <br /> <br />XII.)NWTP High Zone Pumps <br /> <br />XIII.)NWTP Mid Zone Pump Station <br /> <br />XIV.)NWTP Contact Tank Replacement <br /> <br />XV.)Louisville Lateral Lining/Piping -2011 <br /> <br />XVI.)Acquisition of Additional Water Resources <br /> <br />XVII.)Water Meter Replacement Project <br /> <br />XVIII.)Storage Tank Roof Repairs -2011 <br /> <br />XIX.)Eldo Raw Water Meter Relocation Project -2011 <br /> <br />XX.)Louisville Raw Water Pipeline Renovation Study and Project <br /> <br />XXI.)Watershed Protection <br /> <br /> <br />