Laserfiche WebLink
LCityof <br />Louisville <br />Parks & Recreation Advisory Board Memorandum <br />September 24, 2024 <br />To: Parks and Public Landscape Advisory Board <br />From: Bryon Weber, PROS Project Manager <br />Re: Revised Site Plan for Sunflower Park <br />Enclosed is a revised site plan for the proposed layout of Sunflower Park. This concept has been <br />modified to incorporate public feedback received throughout the public input process, including <br />concerns raised at the July 2024 PPLAB meeting. <br />Staff are confident that this plan satisfies the desires and concerns of a broad spectrum of the neighbors <br />and desires to obtain PPLAB's vote of confidence to move forward with more detailed landscape, <br />grading and irrigation construction plans based on this site layout to enable construction cost <br />estimating. <br />Please note the following changes in particular: <br />1) The overall layout has been simplified in design, particularly on the west side of the proposed <br />walkway. <br />2) The new design provides for uninterrupted open grass area on the west/north side of the <br />sidewalk, as requested to support a variety of play activities. Grass area would be regraded and <br />all new sod and irrigation infrastructure installed. <br />3) The half-moon shaped "gathering plaza" has been removed from the design. <br />4) A seating area is now proposed closer to Washington Street, more integrated into the proposed <br />sidewalk for cost efficiency and to highlight opportunity for public art. The area incorporates the <br />sunflower motif in the hardscape and could have a public art piece in the center as a focal point. <br />Seating at the perimeter could be a built seat -wall or free standing benches (options shown on <br />each side of the plaza). <br />5) Existing trees are maintained with exception of one maple in center of property, removed due <br />to poor health and earthwork needed for ADA walkway accessibility compliance. <br />6) Additional new trees proposed around the adventure play area to create a shaded play area <br />over time and a visual buffer to residences to the south. <br />7) Additional new trees and plantings (species TBD) proposed along west property line for buffer <br />and aesthetics. Note, additional plantings unable to be installed on east and south property <br />edges due to existing utility corridors. <br />8) Hillside remains unobstructed for winter use. Weed management on -going by Park's staff. Full <br />turf replacement with water efficient sod variety to be priced in next round of cost estimating. <br />SEE ENCLOSED SITE PLAN DATED <br />7 <br />