My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North End Amendment 2 PCZD GDP Mylar
PORTAL
>
RECORDED PLATS (Mylars) and CITY MAPS
>
General Development Plans
>
N
>
North End Amendment 2 PCZD GDP Mylar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 1:47:57 PM
Creation date
3/14/2017 9:34:17 AM
Metadata
Fields
Template:
CITYWIDE
Doc Type
Mylar
Ord/Res - Year
2011
Ord/Res - Number
1595
Subdivision Name
North End
Cross-Reference
North End Phase II
Record Series Code
40.180
Record Series Name
Maps Drawings Plats Plans
Quality Check
3/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
R <br />DRAWING NUMBER <br />DRAWING NUMBER <br />cc <br />co <br />2 <br />coz <br />cc <br />z <br />• NEW HOPE, MINNESOTA <br />Cu <br />to <br />¢ <br />z <br />OE <br />¢ <br />a <br />ca m <br />I- ¢ <br />U w <br />OOw <br />Q ¢ <br />a <br />0 <br />U <br />LL <br />• NEW HOPE, MINNESOTA <br />SAFCO PRODUCTS <br />REORDER BY PART NUMBER 6552 <br />POSITION EDGE OP PRINT ON THIS UNE <br />w <br />0 <br />CO <br />z <br />Z cu <br />2 <br />m <br />ow <br />m <br />Z EE, <br />• a <br />• m <br />U w <br />0 <br />O 0 <br />0 Lu <br />CC <br />¢ <br />0 <br />a <br />0 <br />PROJECT DESCRIPTION <br />SITE AREA: 73.89 ACRES <br />ZONING: IN COMPLIANCE WITH CITY OF LOUISVILLE <br />COMPREHENSIVE PLAN : <br />COMMERCIAL 8.52 AC <br />MEDIUM DENSITY RESIDENTIAL 32.19 AC <br />LOW DENSITY RESIDENTIAL 27.47 AC <br />DEDICATED PUBLIC LAND 18.80 AC <br />(ENCUMBERED AND NON-) <br />PRIVATE COMMON OPEN AREA <br />NUMBER OF UNITS: <br />PLANNED - 350 <br />3.56 AC <br />ACCESS: SOUTH BOULDER ROAD, PASCHAL DRIVE, <br />HECLA WAY, HECLA DRIVE. <br />PROVIDED WITH PHASE I: 25.4% <br />(REQUIRED PUBLIC LAND DEDICATION: 14.5%) <br />NORTH END AT <br />SOUTH BOULDER ROAD - <br />LEGAL DESCRIPTION <br />PARCEL 1, NORTH END FILING #1 <br />NORTH END <br />CITY OF LOUISVILLE <br />COLORADO <br />NORTH END <br />ARTIST'S RENDERING <br />PROJECT TEAM <br />OWNERS: <br />RIDGELINE DEVELOPMENT CORP. <br />G. E. M. HOLDINGS, LLC <br />NORTH END PROPERTIES, LLC <br />WHITE HAWK RANCH, LLC <br />5723 ARAPAHOE AVE. <br />BOULDER, CO. <br />CONTACT: CHAD KIPFER <br />PLANNING AND DESIGN: <br />PESSIN STUDIOS <br />1633 18TH STREET, SUITE 6 <br />BOULDER, CO. <br />(303) 718-2730 <br />CONTACT: SCOTT PESSIN <br />LANDSCAPE ARCHITECTURE <br />LANDMARK DESIGN <br />1027 PONTIAC ST. <br />DENVER, CO. 80220 <br />(303) 355-0673 <br />CONTACT: GAIL BARRY <br />CIVIL ENGINEERING <br />JLB ENGINEERING CONSULTANTS <br />(303) 604-1634 <br />CONTACT: JIM BLANKENSHIP <br />SHEET INDEX <br />COVER SHEET P -1 <br />GENERAL DEVELOPMENT P - 2 <br />PLAN <br />VICINITY MAP <br />TITLE BLOCKS <br />CITY COUNCIL <br />APPROVED THIS 5 DAY OF TNL'1 , 20 111 BY THE CITY COUNCIL <br />OF THE CITY OF LOUISVILLE, CO. ORDINANCE NO. 1915 <br />SERIES 2011 <br />MAYOR <br />CITY CLERK <br />PLANNING COMMISSION CERTIFICATION <br />APPROVED THIS DAY OF Itt , 20-1-1' BY THE PLANNING <br />COMMISSION OF THE CITY OF LOUISVILLE, CO. RESOLUTION NO. <br />SERIES <br />BOULDER COUNTY CLERK & RECORDER CERTIFICATE <br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT <br />O'CLOCK, .M., THIS DAY OF , 20_ AND IS <br />RECORDED IN PLAN FILE FEE, PAID <br />NO. , RECEPTION <br />CLERK <br />RECORDER <br />OWNERSHIP SIGNATURE BLOCK <br />FILM <br />BY SIGNING THIS GENERAL DEVELOPMENT PLAN, THE OWNER <br />ACKNOWLEDGES AND ACCEPTS ALL THE REQUIREMENTS AND INTENT <br />SET FORTH BY THIS GENERAL DEVELOPMENT PLAN. WITNESS OUR <br />HANDS AND SEALS THIS DAY OF , 20_ <br />OWNER <br />NOTARY <br />2ND AMENDED <br />GENERAL DEVELOPMENT PLAN <br />ZONING - PCZD <br />N <br />0 <br />I <br />DRAWN BY: <br />PESSIN STUDIOS <br />CHECKED BY: <br />PESSIN STUDIOS <br />PROJECT No: <br />ISSUE DATE: 04-28-11 <br />REVISIONS: <br />SHEET TITLE: <br />COVER <br />SHEET NUMBER: <br />P-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.