Laserfiche WebLink
0 <br />0 <br />0 <br />LL <br />0 <br />5/4/2017 9:29: g5 AM <br />AREA OF ASPHALT PAVING. <br />SEE SPECIFICATIONS FOR <br />REQUIREMENTS <br />AREA OF STAMPED <br />CONCRETE PAVING. SEE <br />SPECIFICATIONS FOR <br />REQUIREMENTS <br />PROPOSED IRRIGATION <br />LINE. SEE PAVING NOTES <br />THIS SHEET. <br />LA QUINTA PUD ADMINISTRATIVE AMENDMENT #2 <br />AREA OF STAMPED <br />CONCRETE PAVING. <br />SEE SPECIFICATION <br />FOR <br />REQUIREMENTS <br />PATTERN: HEX TILE <br />COLOR: COBBLESTONE GRAY <br />MANUF. BOMANITE CORP. <br />PHONE: 559.673.2411 <br />WWW.BOMANITE.COM <br />ALE <br />STA1 1 0MPED CONCRETE PLAN DETAIL <br />SC. <br />1 <br />KEY PLAN <br />SCALE: 1/16" = 1'-0" <br />Architect <br />EPSTEIN <br />600 West Fulton <br />Chicago, IL 60661 <br />312.454.9100 <br />Owner <br />LQ ACQUISITION PROPERTIES,LLC. <br />909 Hidden Ridge <br />Irving, Texas 75038 <br />214.492.6600 <br />Project Address <br />La Quinta Inn No. 0952 <br />902 West Dillon Road <br />Louisville, CO 80027 <br />LaC..�U I N TA <br />INNS & SUITES <br />PROPOSED SCOPE OF CHANGES: <br />THE FOLLOWING SCOPE IS INCLUDED IN THIS <br />PUD AMENDMENT: <br />1. RE -COATING THE EXISTING EIFS EXTERIOR <br />WALL: THE EXISTING EXTERIOR COLOR <br />SCHEME IS TWO YELLOW COLORS AND OUR <br />PROJECT WILL BE CHANGING IT TO TWO GREY <br />COLORS AS INDICATED IN THE DRAWINGS. <br />2. APPLYING A LARGE FORMAT TILE TO THE <br />EXISTING EXTERIOR WALL AT THE LOBBY <br />ENTRANCE AND AT THE TOWER: THE EXISTING <br />EXTERIOR WALL WILL REMAIN INTACT AND <br />NEW TILE WILL BE APPLIED TO THE EXTERIOR <br />WALL IN THESE LOCATIONS AS INDICATED IN <br />THE DRAWINGS. <br />3. REMOVING DECORATIVE RAILINGS: THE <br />EXISTING DECORATIVE RAILS AT ALL WINDOW <br />LOCATIONS WILL BE REMOVED AND WALL <br />PATCHED AS INDICATED IN THE DRAWINGS. <br />4. REPLACING EXTERIOR LIGHT FIXTURES: <br />THE EXISTING EXTERIOR WALL MOUNTED <br />SCONCE FIXTURES WILL BE REMOVED AND <br />REPLACED AT THE SAME LOCATION WITH A <br />NEW FIXTURE. <br />5. REPLACING THE PAVING AT THE MAIN <br />ENTRANCE: THE EXISTING PAVING AROUND <br />THE PORTE COCHERE WILL BE REMOVED AND <br />REPLACED WITH ASPHALT AND STAMPED <br />CONCRETE AS INDICATED IN THE DRAWINGS. <br />6. NO CHANGES ARE PERMITTED AS PART OF <br />THIS PUD AMENDMENT. PREVIOUS PUD <br />APPROVALS REMAIN IN EFFECT UNLESS <br />SPECIFICALLY ADDRESSED IN THIS PUD <br />AMENDMENT. <br />PAVING NOTES: <br />1. AT ASPHALT PAVING LOCATIONS PROVIDE 3" <br />ASPHALT OVER 8" OF AGGREGATE. MATCH <br />EXISTING GRADING TO ACHIEVE PROPER <br />DRAINAGE. <br />2. AT STAMPED CONCRETE SIDEWALK <br />LOCATIONS, CONCRETE THICKNESS TO MATCH <br />EXISTING, 4" MIN. MATCH EXISTING GRADING <br />TO ACHIEVE PROPER DRAINAGE. <br />3. AT STAMPED CONCRETE PAVING <br />LOCATIONS, CONCRETE THICKNESS TO MATCH <br />EXISTING, 6" MIN. OVER 4" AGGREGATE. <br />MATCH EXISTING GRADING TO ACHIEVE <br />PROPER DRAINAGE. <br />4. ALL GRADING TO MATCH EXISTING TO <br />ACHIEVE PROPER DRAINAGE WITH 2% MAX. <br />SLOPE. ALL ADA REQUIREMENTS TO BE <br />MAINTAINED. <br />SHEET 1 OF 3 <br />NOTES <br />EXTENTS OF LARGE FORMAT TILE <br />AT GROUND LEVEL. <br />SEE ELEVATIONS FOR LARGE <br />FORMAT TILE LOCATIONS ON <br />TOWER. <br />NOT IN CONTRACT <br />OWNERSHIP SIGNATURE BLOCK <br />By signing this PUD, the owner acknowledges <br />and accepts all the requireements and intent set <br />forth in pis PUD. Witness my/our hand(s) seal(s) <br />this day of . 20 <br />PePte <br />,, <br />wner N <br />ignature <br />gmbetA) & <br />Notary Name ( <br />Notary Signatu <br />Expires l�i:a <br />Ave <br />(Notary Seal) <br />SUISMILiv <br />NOM 1algaIN <br />ADMINISTRATIVE AMENDMENT APPROVAL <br />APPROVED THIS4e- DATE OF 2017 <br />DIRECTOR OF PLANNING <br />DATE pa 107._ <br />ALL DIMENSIONS SHOWN TO 3E FIELD VERIHEU U.NC. <br />NO. DATE REVISIONS/ISSUANCES <br />EPSTEIN <br />Architecture <br />Interiors <br />Engineering <br />Construction <br />600 W. Fulton Street <br />Chicago, IL 60661-1259 <br />T 312.454.9100 <br />www.epsteinglobal.com <br />Chicago <br />New York <br />Bucharest <br />Warsaw <br />PROJECT NUMBER: <br />PROJECT MANAGER: <br />ARCH/ENG: <br />SCALE: <br />DRAWN BY: <br />CHECKED BY: <br />KEY PLAN <br />16322 <br />LR <br />JH <br />As indicated <br />JP <br />LR <br />A-1 <br />2017 A. Epstein and Sons International, Inc. All rights reserved. <br />