Laserfiche WebLink
PASCHAL DR <br />Upon completion of a westerly <br />parallel roadway connection from <br />Paschal Drive to South Boulder Road, <br />a traf“c study will be prepared to <br />evaluate the elimination of the <br />acceleration lane. <br />Road with Landscaped <br />curb and gutterarea <br />Road without Hardscaped <br />Speed Table <br />curb and gutterarea <br />Trail <br />New RoadProposed <br />(crusher “ne) <br />Traf“c Signal <br />5 Lane <br />Sidewalk <br />Constuction Limits <br />