My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Annual Report 1983, City of Louisville
PORTAL
>
HISTORICAL RECORDS (50.000)
>
Annual Report 1983, City of Louisville
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 10:36:49 AM
Creation date
9/23/2013 10:55:04 AM
Metadata
Fields
Template:
CITYWIDE
Doc Type
Historical Records
Record Series Code
50.000
Record Series Name
Historical Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' 7 <br /> 1983 <br /> Cit y of Louisville <br /> Annual Report <br /> A message from the mayor <br /> As a community we have seen several new pro- <br /> jects started and completed with only a few major <br /> problems arising in the infrastructure of our city. <br /> The new pressurized 60-inch pipeline past the <br /> Marshall landfill project is completed with only a few <br /> minor improvements yet to come. <br /> Homart's agreement with the city was finally com <br /> pleted and our citizens have a workable deal with <br /> both parties having commitments to assure the quali- -' <br /> ty and success of the city's and venture's concepts. Ar ter:, <br /> We have all learned it takes time and cooperation to <br /> j ', <br /> make things work. <br /> , <br /> Boulder County's portion of South Boulder Road <br /> is presently under construction and will cause some <br /> inconvenience but will truly be a worthwhile effort to <br /> improve traffic flow in the area. The city's portions of <br /> South Boulder Road are being postponed but should <br /> be resumed as soon as we can make the proper <br /> financial arrangements. <br /> As everyone is aware, we have experienced water <br /> restrictions due to limitations and late construction at <br /> our water treatment facility on the hill. The City, our We have solved quite a few problems, but we still <br /> consultants and the contractor are working diligently have a lot of work. We can only accomplish good <br /> to resolve the problems at the plant. With this crisis, things with you, the people, and your participation <br /> as with any other, I ask for your cooperation and and support.. <br /> assistance in trying to make do with what we can This is the best town in the state and to keep it <br /> safely offer until sometime in September when we that way, I need your help. <br /> can complete, test and accurately measure our rebuilt <br /> facility. Sincerely, <br /> Once again, please cooperate with our restrictions, / <br /> because all our safety and welfare are on the line. / f <br /> We must limit production in order to assure a sound <br /> system in case of an emergency. Norbert A. Meier, Mayor <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.