•
<br />•
<br />■
<br />■
<br />■
<br />REQUIRED PUD & SPECIAL REVIEW USE CERTIFICATES
<br />CITY COUNCIL CERTIFICATE
<br />APPROVED THIS 1111,4AY OF S 1.4-00- , 2004 BY THE CITY
<br />COUNCIL OF THE CITY OF LOUISVILLE, COLORADO. RESOLUTION NO.
<br />Z2-- SERIES 2-'D011
<br />MAYOR
<br />CI CLERK
<br />PLANNING COMMISSION CERTIFICATE
<br />RECOMMENDED APPROVAL THIS I D DAY OF FLAork-Al . , 200L BY THE
<br />PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO.
<br />RESOLUTION NO. S SERIES 7-DO
<br />SECRETARY
<br />CLERK AND RECORDER CERTIFICATE
<br />(COUNTY OF BOULDER, STATE OF COLORADO)
<br />I HEREBY CERTIFY THAT THIS INSTRUMENT WAS FILED IN MY OFFICE AT
<br />3 ..47 O'CLOCK, P .M., THIS IloTH DAY OF AutGrIAST , 2005.
<br />AND IS RECORDED IN PLAN FILE P. F .4 'AQ ,i FEE 416(.00 PAID
<br />** I2113,14)15, I! 0171 I$FtLM hie. 2713 $ 0 2. , RECEPTION
<br />IQtwo Z1 .7.2 123,214 ,25,2(04 21
<br />L.1 MD \
<br />RECORDER
<br />OWNERSHIP SIGNATURE BLOCK
<br />DEPUTY
<br />BY SIGNING THIS PIED, THE OWNER ACKNOWLEDGES AND ACCEPTS ALL THE
<br />REQUIREMENTS AND INTENT SET FORTH IN THIS PUD.
<br />Witness our hands and seals this 1l0i= day of RUA-12Y' ,
<br />OWNER
<br />)rnz'ro'ketcb
<br />Mr coy► Expires May7, 200,E
<br />PROJECT DATA:
<br />Area Calculations:
<br />Building Footprint
<br />Access Drives
<br />Parking/circulation*
<br />Open Area
<br />Landscape
<br />Hardscape
<br />Total Lot Area
<br />*Includes curbs
<br />30,050sf (26 %)
<br />7,409sf (6 %)
<br />15,006sf (13 %)
<br />62,912sf (55 %)
<br />47,389sf (75 %)
<br />15,523sf (25 %)
<br />115,375sf (100%)
<br />(± 2.6 Acres)
<br />Density:
<br />Total Number of Units Allowed: 115,375sf / 1750sf = 65.9
<br />(Per Sec. 17.12.040 Louisville Municipal Code)
<br />Total Number of Units Provided 66 Units
<br />(54 - 2 bedroom units, ± 1225sf)
<br />(12 -1 bedroom units, ± 905sf)
<br />Parking Calculations:
<br />Total Parking Required: 132 (2 sp per dwelling unit)
<br />(Per Sec. 17.20.020 Louisville Municipal Code)
<br />Total Parking Provided: 132 Gar + 28 Surface
<br />161 Total
<br />*Accessible Spaces Required: 2.6 (Per IBC 1106.2)
<br />Accessible spaces Provided: 4 Gar + 2 Surface
<br />6 Total
<br />NOTES:
<br />The access movements shown on the PUD are s abject to
<br />change. If, at any time in the future, it is determined by the
<br />City that change is appropriate to enhance traffic flow on
<br />one or more surrounding streets, or to mitigate an unsafe
<br />situation, upon notification from the City, the Centennial
<br />Pavilion property owner(s) shall make such physical
<br />changes, at their cost, as may be required by the City.
<br />Each present and future property owner shall acknowledge
<br />in writing the foregoing authority of the City.
<br />PROJECT DATA FOR PREVIOUSLY
<br />APPROVED PUD (SW):
<br />Area Calculations for previous PUD approval (SW):
<br />19,000sf (16.5%)
<br />9,147sf (7.9 %)
<br />41,512sf (36.0%)
<br />45,716sf (39.6%)
<br />27,238sf (59.6%)
<br />18,478sf (40.4%)
<br />115,375sf (100%)
<br />(± 2.6 Acres)
<br />Floor Area Ratio (FAR):
<br />Office (SW)
<br />Total Building Area = 30,000sf
<br />Total Site Area = 115, 375sf
<br />FAR = 26.0%
<br />Parking Calculations:
<br />Office (SW)
<br />Medical Off. (20%) e,OCO 6.0/1,000 = 36 sp. req.
<br />Misc. Off. (Ou%) 24,000 SF @ 4.0/1,000 = 96 sp. req.
<br />VICINITY MAP
<br />NTS
<br />FINAL PUD Sc SPECIAL REVIEW USE
<br />DEVELOPMENT PLAN
<br />CENTENNIAL PAVILION LOFTS
<br />LDUISVILLE, COLORADO
<br />• •
<br />• •
<br />It
<br />shall only be used for the project and site specifically identified
<br />herein and shall not be used on any other project.
<br />DRAWING INDEX:
<br />A0.0
<br />A1.1
<br />A1.2
<br />A2.1
<br />L1.1
<br />L1.2
<br />C1
<br />C2
<br />C3
<br />C4
<br />• A3.1
<br />A3.2
<br />A3.3
<br />A3.4
<br />A4.1
<br />E1.1
<br />■
<br />COVER SHEET
<br />OVERALL SITE PLAN
<br />LOFTS SITE PLAN
<br />GARAGE/UNIT PLANS
<br />LANDSCAPE PLAN
<br />IRRIGATION ZONES
<br />MASTER UTILITY PLAN
<br />GRADING & DRAINAGE PLAN
<br />CROSS SECTIONS
<br />POND DETAILS
<br />ELEVATIONS
<br />ELEVATIONS
<br />BUILDING SECTION/DETAILS
<br />COLOR RENDERINGS
<br />SIGNAGE PLAN
<br />SITE LIGHTING/PHOTOMETRICS
<br />PAVILION LOFTS
<br />CENTENNIAL PAVILION
<br />LOUISVILLE, CO
<br />SPS DEVELOPMENT CO, LLC
<br />411 CAMINO BOSQUE
<br />BOULDER, CO 80303
<br />■ 303.545.5166
<br />11-20-2003
<br />• 01-05-2004
<br />COVER SHEET
<br />A0.0
<br />ni 1 Dina rill aiVibd a0 i61:6 NUi1WUd-
<br />m
<br />T
<br />0
<br />mp
<br />Op
<br />°H
<br />{
<br />z
<br />z
<br />C
<br />33 -0
<br />CDm
<br />co
<br />cn
<br />0
<br />D
<br />T
<br />0
<br />-D
<br />D
<br />CD
<br />� m
<br />0�
<br />CO2
<br />cn
<br />0
<br />co
<br />0
<br />0
<br />jj
<br />F 0 �
<br />mm0
<br />T• .
<br />• E
<br />]-0
<br />x �m
<br />cmn
<br />CO
<br />z
<br />0
<br />`dd Ae 8308o3
<br />33
<br />z
<br />0
<br />z
<br />co
<br />m
<br />3
<br />33
<br />z
<br />0
<br />c
<br />33
<br />Centennial Pavilion Lofts
<br />
|