Laserfiche WebLink
SUBJECT: CONTRACT WITH KCI FOR ENCLAVE & SUNFLOWER PARKS <br />DATE: FEBRUARY 4, 2025 <br />PAGE OF <br />Sunflower Park: Removal of the existing non-ADA compliant walkway, all existing turf <br />grass and the fire damaged trees on plans. Renovations will include earthwork grading to <br />enlarge the grass play area, construction of a new ADA compliant concrete walkway with <br />decorative sunflower motif, installation of playable stump and stone landscape features, <br />enhanced plantings featuring new trees, shrubs and perennials and all new sod with a <br />turf grass blend aimed at balancing heavy use and water conservation. Landscape <br />enhancements will be supported by new irrigation infrastructure. <br />Enclave Park: In partnership with the Public Work's Storm Water Quality Pilot Project, the <br />existing fire damaged play equipment and concrete play pit borders have been removed <br />and a new rock cobble drainage swale is currently being installed. Following completion <br />of Public Work's stormwater project, the park renovations will include removal of turf grass <br />from the bottom of the drainage basin and regrading to enhance the area for play. A new <br />playground will be installed with an adjacent concrete patio featuring a shade structure <br />and a variety of seating opportunities. Enhanced plantings featuring new trees, shrubs <br />and perennials will be planted for aesthetics and to help buffer adjacent residences. <br />Construction areas will be restored by new sod with a turf grass blend aimed at balancing <br />heavy use and water conservation. All enhancements will be supported by new irrigation <br />infrastructure. <br />The design of both parks has been part of a public review and input process going back <br />to fall of 2023 and continuing through January 2025. Numerous iterations of design <br />have been explored to balance expressed community desires, concerns of adjacent <br />neighbors and PPLAB board member feedback with each park's unique opportunities <br />and constraints. <br />Details of this engagement and the process up to this point include: <br />• Summer 2023 — Grant application to Great Outdoors Colorado (GOCO) for <br />funding support, including public letters of support for renovations at both parks <br />• Fall 2023 — Online Public Input Survey <br />• December 2023 — Community Impact Grant Award from GOCO ($500k) <br />• January 2024 — Public Open House and presentation of initial designs <br />• March 2024 — PPLAB Presentation of initial designs and open house feedback <br />• May 2024 — PPLAB Presentation of revised designs at 80% completion level <br />• July 2024 — PPLAB Presentation of designs at 90% completion level <br />• October 2024 — PPLAB Presentation of modified concept design for Sunflower <br />Park, going back to 60% level in response to public input received <br />• January 2025 — PPLAB Presentation of 95% drawings with pricing & PPLAB <br />support to move projects forward for contract consideration with direction to <br />review turf & plant lists at Sunflower and consider revisions to seating options at <br />Enclave during final 5% drawing set completions. Both of these <br />recommendations for follow up have taken place and will be suggested revisions <br />will be implemented. <br />CITY COUNCIL COMMUNICATION <br />CC 02/04/25 15 <br />