My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2007 01 02
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2000-2009 City Council Agendas and Packets
>
2007 City Council Agendas and Packets
>
City Council Agenda and Packet 2007 01 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:02:06 PM
Creation date
2/6/2007 9:14:09 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
1A4 1A5
Record Series Code
45.010
Supplemental fields
Test
CCAGPKT 2007 01 02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> -. <br /> [}Jflj@fA&T? <br /> COUNCIL COMMUNICATION <br /> TO: MAYOR AND CITY COUNCIL <br /> FROM: HEATHER BALSER, INTERIM CITY MANAGER <br /> DATE: January 2, 2007 <br /> SUBJECT: Resolution No.1, Series 2007, a Final Planned Unit Development (PUD) Plan <br /> for 1775 Cherry Street, Lots 9 - 14, Block 5, Colorado Technology Center <br /> Filing No.1 <br /> BACKGROUND: <br /> The applicant/owner is requesting approval of a final planned unit development (PUD) plan to allow for <br /> the construction of a 130,187 square foot flex office / warehouse building in the Colorado Technology <br /> Center. This project requires the consolidation of lots 9 through 14, Block 5 of the Colorado Technology <br /> Center Filing No.1, which is approximately 8.91 acres in size. Therefore, a Covenant Agreement will be <br /> required to consolidate these properties. <br /> The proposed building is designed for multiple tenants including a mix of office, light manufacturing, <br /> industrial and warehouse uses. The building proposal is subject to the design standards of the Industrial <br /> Development and Design Standards and Guidelines (IDDSG). <br /> SUMMARY AND STAFF COMMENTS: <br /> Grading and Site Plan: <br /> The proposed building is approximately 130,187 square feet, and allows for parking on all sides of the <br /> development, as well as loading docks in the rear of the building (located on the south side of the <br /> building). <br /> Property access is provided by 3 separate access points along Cherry Street, which offers good internal <br /> circulation. <br /> The property currently has a grade drop of approximately 17 feet from east to west. For the applicant to <br /> provide one continuous floor elevation for the 900 foot building, there needs to be a certain degree of <br /> regarding and fill to make the finished floor elevation plumb (the finished floor elevation is 5,309.0). <br /> Because of this, the applicant is required to retain the proposed detention pond on the east side of the <br /> parking lot. <br /> It should be noted that the retaining walls proposed for the detention pond exceed 30" in height (they are <br /> 48" in height). According to the IDDSG, if the wall is to be higher than 30", then there must be safety <br /> measures taken to insure the public safety. It is required that either a railing, fence or hedge be placed <br /> along the edge to prevent any potential hazards. That applicant has agreed to place landscape hedges <br /> along the top of the retaining walls to provide the necessary buffer. <br /> 1!5 SUBJECT Resolution No.1, Series 2007. AGENDA ITEM <br /> a Final Planned Unit Development (PUD) Plan for <br /> 1775 Cherry Street, Lots 9 - 14, Block 5, Colorado 4C <br /> Technology Center Filing No.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.