My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2007 01 02
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2000-2009 City Council Agendas and Packets
>
2007 City Council Agendas and Packets
>
City Council Agenda and Packet 2007 01 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:02:06 PM
Creation date
2/6/2007 9:14:09 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
1A4 1A5
Record Series Code
45.010
Supplemental fields
Test
CCAGPKT 2007 01 02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> .- <br /> [}Jflj@fA&T? <br /> Letter ofIntent ~~~;;Z~~ @i <br /> Proposed Building 1775 Cherry <br /> Colorado Tech Center PLANNING I <br /> October 19, 2006 The proposed Building 1775 Cherry is 130,187 square feet and will be sited on <br /> Lots 9, 10, 11, 12, 13 and 14, Block 5, Colorado Technological Center First Filing. <br /> These lots total 8.91 acres (388,120 square feet). <br /> The property is zoned I-Industrial and the proposed improvements will comply <br /> with the City of Louisville Industrial Development Design Standards & Guidelines <br /> except for parking requirements. Even though the parking provided does not satisfY the 2 <br /> spaces per 1000 SF requirement (design is at 1.88 spaces per 1000 SF) the site design <br /> provides for future office parking at loading docks and service areas with the capability to <br /> provide up to 3.58 spaces per 1000 SF depending upon tenant requirements. <br /> Building 1775 Cherry will be developed as a speculative real estate investment in <br /> that there are no tenants at this time to define the proposed uses. It is anticipated that <br /> tenants will be similar to our other buildings located in Colorado Tech Center at <br /> 321 South Taylor Avenue, 346 South Arthur Avenue and 1480 Arthur Avenue as well as <br /> the Building 1795 currently under construction on Dogwood Street. <br /> Uses will include a mixture of office, light manufacturing, industrial and <br /> warehouse with multiple tenants occupying the building. <br /> Building 1775 Cherry includes the following features: <br /> . Site cast concrete tilt-up construction with north, west and east building <br /> elevations incorporating both storefront and punched window openings. <br /> . Three color paint scheme with course textured coating finish (proposed <br /> building colors are attached). <br /> . Window systems shall be clear anodized aluminum with low e green tinted glass. <br /> . Minimum 24 feet interior clear height with parapet heights varying from 128' 3" <br /> AFFto 131' 6" AFF. <br /> . Service flexibility with multiple dock high and drive-in doors at the south <br /> building elevation. <br /> . Increased electrical service capacity. <br /> . Fully sprinklered. <br /> . Parking flexibility as described above. <br /> . Employee break areas with both areas including a sun shelter. <br /> . Alternative for an exterior equipment storage yard depending upon tenant <br /> requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.