My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2025 06 12
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2025 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2025 06 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:50:00 PM
Creation date
6/12/2025 3:47:19 PM
Metadata
Fields
Template:
City Council Records
Meeting Date
6/12/2025
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Staff Report <br />June 12, 2025 <br />PROPOSAL: <br />The applicant is proposing to install approximately 33,500 square feet of solar canopy <br />structures on the subject property. Approximately half of the canopy structures will be in <br />the western front and side parking areas, and the remaining solar canopy structures will <br />be located along the rear truck court. The solar structures proposed along the front and <br />side parking areas will be approximately 18.75 feet tall with a vehicle clearance height <br />of 15.3 feet. The solar cover is approximately 18.75 feet wide. The solar canopies will <br />cover 99 existing parking spaces and will not take away any existing parking spaces. <br />The solar canopies in the rear truck court will be 28 feet tall and 37.6 feet wide. The <br />canopy columns will be spaced approximately 18 feet apart. All canopy posts will be set <br />in concrete at a diameter of 2 feet and a depth of 13-14.5 feet. <br />.l1NDArION PLAN <br />D^ <br />'1 H(]TTOM OF COLUMN <br />a. � <br />SOLAR PARS <br />NEW STEEL <br />GOL M <br />MOTES• <br />µss+azzv+a T - T <br />—ti g <br />m � <br />lI 9CVFPNIEL9 <br />1 <br />ZR <br />j 1DATION PLAN 1(I <br />'CTNY uHoaT7s1 .T7 <br />I ASPHALT PAYING <br />1.1 _ _ rt BOTTOM OF COLUMN <br />• <br />SOCK AND MAN <br />iMLE55NpTE0 <br />NEW STEEL COLUMN <br />r SASHES L. DIpCATES EASTWOOD. <br />SCREEN WALLS ON EAST3 WEST 59ES OF <br />iii <br />DOCK <br />NEW 2 A. IT DEEP CONC, <br />Fgl10ATI.AT LONE PAD <br />3 <br />EDGE OP CONC. <br />COd[SPENT <br />PO WMEL <br />NEW]' fl 1TAT DEW <br />CONC. FCAOuEErvAREON nT <br />Proposed soar canopies over <br />parking lot (above) and rear <br />loading dock (left). <br />
The URL can be used to link to this page
Your browser does not support the video tag.