My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2025-46
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2025 Resolutions
>
Resolution 2025-46
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2025 11:32:17 AM
Creation date
7/24/2025 9:42:02 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
APPROVING AN AGREEMENT WITH JVA, INC. FOR CONSTRUCTION MANAGEMENT SERVICES
Meeting Date
7/8/2025
Doc Type
Resolution
Signed Date
7/8/2025
Ord/Res - Year
2025
Ord/Res - Number
46
Quality Check
7/24/2025
Supplemental fields
Parties Involved
JVA Inc
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A — Scope of Services <br />Construction administration services for the Howard Berry and Sid Copeland Water <br />Treatment Plants Chlorine Dioxide Systems Replacement Project. The project includes <br />the final installation of temporarily plumbed Pureline chlorine dioxide units and ancillary <br />pumping and piping connections and HVAC. <br />Assumptions: <br />1. Construction Administration <br />a. 6-month construction contract to final completion <br />b. Coordinate Preconstruction Meeting <br />c. Attendance at biweekly meetings/field observation — 12 meetings <br />d. Assume City staff will provide additional field observation support <br />e. Review submittals and/or shop drawings <br />f. Answer request for information (RFI's) <br />g. Review pay applications <br />h. Evaluate Change Orders and provide recommendations to the City <br />i. Prepare As-Builts from contractor mark-ups <br />j. Assist with final close-out documentation <br />Scope of Services: <br />The scope of services for Construction Administration (CA) are detailed in the following. <br />The CA includes both office and field engineering services during construction and <br />project closeout. <br />1. JVA will coordinate a pre -construction meeting. We will prepare an agenda <br />and distribute minutes following the meeting. <br />2. JVA will review product and material submittals (chemical pump, potable water <br />booster pump, piping, HVAC and electrical) for conformance with the <br />construction documents. Submittals will be received, reviewed and returned <br />electronically with an electronic submittal review stamp. JVA will maintain and <br />update the submittal review log accordingly. <br />3. JVA will attend biweekly construction meetings and review construction <br />progress while on site. JVA will prepare site observation reports for distribution to <br />the City for every site visit. Contractor is required to administer the meetings. <br />4. JVA has subcontracted with MEC Inc for HVAC shop review and a rough in <br />inspection. <br />5. JVA will review monthly pay applications, construction progress and provide a <br />recommendation of approval or corrections to the City. <br />6. JVA will prepare responses to Request for Information (RFI). The intent of the <br />RFI is to provide clarification and detail to facilitate construction progress. JVA <br />will notify the City of any RFI project cost implications. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.