Laserfiche WebLink
1 -3 Year Capital Improvement Projects <br />0 <br />Project <br />2011 <br />2012 <br />2013 <br />Notes <br />Action <br />Cost <br />Action <br />Cost <br />Action <br />Cost <br />11 <br />Pine and Main Street <br />Parking <br />C <br />1,000 <br />Added with Lucky Pie /LULU SRU <br />12 <br />Spruce Street Parking <br />C <br />1,000 <br />Restriping adding one parking <br />space <br />21 <br />County Annex Shared <br />Parking <br />C <br />5,000 <br />28 <br />Employee Parking Manual <br />C <br />1,000 <br />4 <br />South and Front Street <br />Improvements <br />D <br />10,000 <br />Design as part of $100,000 TIP <br />funding <br />20 <br />City Hall Vehicle Parking <br />Policy <br />C <br />0 <br />No cost, policy action <br />5 <br />South Street Underpass <br />D <br />90,000 <br />D <br />100,000 <br />2011 design as part of $100,000 <br />TIP funding, 2012 funding is <br />for final design. <br />16 <br />Wayfinding <br />D,C <br />80,000 <br />$16,000 for design and $64,000 <br />for construction <br />8 <br />Pine Street Gateway <br />D,C <br />15,000 <br />Design through wayfinding <br />study, money is for construction <br />3 <br />Marketplace Walkway <br />D,C <br />50,000 <br />Work in conjunction with <br />property owner <br />10 <br />Parking Garage <br />Improvements <br />C <br />1,000 <br />15 <br />Bicycle and Stroller <br />Parking <br />C <br />10,000 <br />25 <br />Newspaper vending <br />machines <br />D,C <br />24,000 <br />30 <br />Increase Downtown <br />Events <br />D,C <br />30,000 <br />2011 construction to be <br />completed by DBA. City will re- <br />imburse in 2012. <br />14 <br />Main Street Patios <br />D,C <br />220,000 <br />24 <br />Pedestrian Intersection <br />Improvements <br />50,000 <br />To be completed when Main <br />Street Patios are completed <br />2 <br />Parks and Recreation <br />Plaza <br />D,C <br />40,000 <br />27 <br />Modify Fee -in -Lieu of <br />Parking Policy <br />C <br />5,000 <br />19 <br />Extend 2 Hour Time Limit <br />C <br />1,000 <br />1 <br />Main Street Kiosk Plaza <br />D <br />35,000 <br />17 <br />Walking Tour /Public Art <br />Program <br />5,000 <br />32 <br />Snow removal strategy <br />5,000 <br />Totals <br />108,000 <br />310,000 <br />361,000 <br />D = Design, C = Construction <br />* ID number corresponds with number on Downtown Parking and Pedestrian Action Plan Graphic (Atttachment 2) <br />