Laserfiche WebLink
1-3 Year Capital Improvement Projects <br />Main Street Kiosk Plaza <br />r <br />0 2011 Projects <br />2012 Projects <br />® 2013 Projects <br />South Street Underpass <br />NMI <br />Marketplace Walkway <br />Measures of Success <br />Thirty -one (31) projects identified below increase the parking <br />supply or maximize its utilization through management solutions. <br />Some of the projects selected will enhance the utilization of <br />remote parking by improving the quality of the pedestrian <br />experience. The six success measures listed below were estab- <br />lished to determine if a project effectively enhances the pedes- <br />trian environment. <br />Accessible - Projects which help make downtown a place that <br />can be enjoyed by people of all ages and mobility levels. <br />Comfortable - Projects which help visitors feel at ease with their <br />surroundings and provide a feeling of personal safety. <br />Convenient - Projects which develop a clear image for down- <br />town and create a place easily understood to residents <br />and visitors alike. <br />Connected - Projects which link together multiple pathways to <br />multiple activities, resources, services, and places. <br />Engaging - Projects which help to create a visually rich <br />downtown with interrelated parts allowing visitors and <br />residents to connect with each other and downtown. <br />Vibrant- Projects which build a downtown pulsating <br />with life, vigor, and activity. <br />ID 4* Project <br />w <br />v <br />. m <br />. <br />cu <br />cu <br />V w <br />a 3 <br />w <br />O <br />V <br />oa <br />m <br />W <br />0 <br />Additional <br />Parking <br />No <br />Time <br />Limit <br />Time <br />Limit <br />1 Main Street Kiosk Plaza <br />2 Parks and Recreation Plaza <br />3 Marketplace Walkway <br />4 South and Front Street <br />5 South Street Underpass <br />X X X <br />X X X X <br />X X X X <br />8 Pine Street Gateway X X X <br />10 Parking Garage Improvements <br />11 Pine and Main Street Parking <br />12 Spruce Street Parking <br />14 Main Street Patios <br />15 Bicycle and Stroller Parking <br />16 Wayfinding <br />17 Walking Tour/Public Art Program <br />32 Snow Removal Policy <br />x X X X <br />X X X <br />X X X 2 <br />X <br />X <br />X <br />X <br />X <br />x <br />X <br />X <br />X <br />19 Extend 2 Hour Time Limit X <br />20 City Hall Vehicle Parking Policy X X x 10 <br />21 County Annex Shared Parking X X <br />24 Pedestrian Intersection <br />Improvements <br />25 Newspaper vending machines X X X <br />X x x x <br />X X <br />30 Events Infrastructure and Planning X X x <br />X X x <br />xiMMM <br />X X -12 <br />X X <br />x X' <br />27 Modify Fee -in -Lieu of Parking X X X <br />Policy <br />28 Employee Parking Manual <br />TOTALS 22 Spaces Gained <br />