Laserfiche WebLink
Open Space Advisory Board <br />Minutes <br />May 11, 2011 <br />Page 4 of 4 <br />iv. Development and Administration of Open Space Dog Off <br />Leash Area Survey <br />1. OSAB have printed the survey, and the survey has <br />been posted on-line. <br />2. Date and time will be included on the survey. <br />3. Decided to expand the survey to include all users of <br />Davidson Mesa. <br />4. OSAB decided to table discussion and distribution <br />until there are more members present. Identified <br />need to determine specifically what OSAB's goals are <br />on the property. <br />X. Discussion Item: City Council Study Session Preparation <br />1. Ember presented the preliminary OSAB power point presentation. <br />2. Any additions need to be included prior to May 24. <br />XI. Discussion: Changing Regular Meetings from Evenings to Morning <br />1. At this point, OSAB did not wish to change the time of regular meetings. <br />XII. Discussion Items for Next Meeting on June 8, 2011 <br />1. McCaslin Crossing Options <br />2. CTC Trail Alignment Conversation <br />3. Possibility of Having Maps Available at Trail Heads/Intersections <br />XIII. Adjourn — The meeting was adjourned at 9:45 pm. <br />