My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2011-34
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2010-2019 Resolutions
>
2011 Resolutions
>
Resolution 2011-34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 10:19:54 AM
Creation date
7/7/2011 11:46:10 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Resolution
Signed Date
6/28/2011
Ord/Res - Year
2011
Ord/Res - Number
34
Original Hardcopy Storage
7D5
Supplemental fields
Test
RES 2011-34
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGREEMENT REGARDING <br />FINAL DESIGN, RIGHT -OF -WAY ACQUISITION AND CONSTRUCTION <br />OF DRAINAGE AND FLOOD CONTROL IMPROVEMENTS FOR DRAINAGEWAY A -2, <br />CITY OF LOUISVILLE <br />Agreement No. 11 -04.03 <br />f / <br />THIS AGREEMENT, made this 21 day of -1-74, l , 2011, by and <br />between URBAN DRAINAGE AND FLOOD CONTROL DISTRICT ( hereinafter called "DISTRICT ") <br />and CITY OF LOUISVILLE (hereinafter called "CITY ") and collectively known as "PARTIES "; <br />WITNESSETH: <br />WHEREAS, DISTRICT, in a policy statement previously adopted (Resolution No. 14, Series of <br />1970 and Resolution No. 11, Series of 1973) expressed an intent to assist public bodies which have <br />heretofore enacted floodplain regulation measures; and <br />WHEREAS, PARTIES participated in a joint planning study titled "Lafayette — Louisville <br />Boundary Outfall System Plan Conceptual Design Report" by McLaughlin Water Engineers, dated <br />January, 2011. (hereinafter called "PLAN "); and <br />WHEREAS, PARTIES now desire to proceed with the design, right -of -way acquisition and <br />construction of drainage and flood control improvements for Drainageway A -2 (hereinafter called <br />"PROJECT "); and <br />WHEREAS, DISTRICT has adopted at a public hearing a Five -Year Capital Improvement <br />Program (Resolution No. 68, Series of 2010) for drainage and flood control facilities in which PROJECT <br />was included in the 2011 calendar year; and <br />WHEREAS, DISTRICT has heretofore adopted a Special Revenue Fund Budget for calendar year <br />2011 subsequent to public hearing (Resolution No. 52, Series of 2010) which includes funds for <br />PROJECT; and <br />WHEREAS, DISTRICT's Board of Directors has authorized DISTRICT financial participation for <br />PROJECT (Resolution No. 29, Series of 2011); and <br />WHEREAS, the City Council of CITY and the Board of Directors of DISTRICT have authorized, <br />by appropriation or resolution, all of PROJECT costs of the respective PARTIES. <br />NOW, THEREFORE, in consideration of the mutual promises contained herein, PARTIES hereto <br />agree as follows: <br />1. SCOPE OF THIS AGREEMENT <br />This Agreement defines the responsibilities and financial commitments of PARTIES with respect <br />to PROJECT. <br />2. SCOPE OF PROJECT <br />A. Final Design. PROJECT shall include the final design of improvements in accordance with <br />the recommendations defined in PLAN. Specifically, the final design of facilities shall <br />\dcm\agmrint \11 \110403 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.