My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2011 09 19
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
GOLF COURSE ADVISORY BOARD
>
2011 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2011 09 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:03 PM
Creation date
9/23/2011 11:09:11 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2011 09 19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
building. Locating the pro-shop on the west side of the building and creating a front facing <br />gable on the new porch outside of the pro-shop helps to direct traffic to the larger west parking <br />lot. The rear deck has been expanded and a portion of it has been covered. A new private <br />meeting area and connected private deck have been added on the east side of the building. <br />A new ADA ramp has been added in front of the building and connects to both the dining room <br />entrance and the pro-shop entrance. The existing dumpster enclosure has been relocated <br />and a new golf cart turnaround has been constructed adjacent to the parking lot (golf carts are <br />not allowed in the parking lot). <br />Copies of the proposed schematic renovation plans and exterior renderings are included with <br />this report. <br />CCTE: <br />ONSTRUCTION OST AND IMELINE STIMATES <br />Estimates for the cost of construction and length of construction are included below. These <br />estimates are based on cost-per-square-foot numbers for similar scopes of work in similar <br />projects. These estimates represent only the costs of improvements to the facility. <br />Specifically excluded from these estimates are the costs of furniture, kitchen equipment, <br />inventory and overstock storage systems, golf carts, and maintenance equipment. <br /> The total cost of this renovation work is estimated at: <br /> $300,000.00 <br />The total time to complete this renovation is estimated at: <br /> 4-6 months of construction <br />CCGCCIS <br />September 6th, 2011 <br />OAL REEK OLF OURSE LUBHOUSE MPROVEMENTS UMMARY <br />Lodestone Design Group 4 of 4 <br />Page <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.