My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2011 10 17
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
GOLF COURSE ADVISORY BOARD
>
2011 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2011 10 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:03 PM
Creation date
10/18/2011 9:22:36 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2011 10 17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(COST OF RENOVATION <br />C'o>. C'RLLI. 6 C(11 >;sr: I'rt:r.rnlrA.JR) L0.i1(, Ri Ac1- :Lf1sn i PL_i A Sri n) <br />he Tong -range master plan prepared <br />by Herfort Norby indicates that, if all <br />recommendations were implemented, the <br />cost of a renovation would likeey range <br />between $3 and $4 million. If the City should <br />also chose to pursue the maintenance facility <br />improvements and clubhouse improvements, <br />the renovation project could likely increase <br />by roughly to million. <br />Compromised pond liner nn hole 11. <br />For purpose of prioritizing future projects, we have categorized improvements into critical, <br />competitive and comprehensive. Those items listed as critical are, in our opinion, those <br />improvements which are in greatest need of being addressed and would play the most <br />significant role in reducing or stabilizing repairs and maintenance and in increasing revenue <br />through increased daily fee rounds. <br />Critical <br />1. Remove trees to correct safety issues on holes No. <br />2. Remove trees to improve turf quality and �at:;�yo <br />,14,17 and 18. <br />3. Repair existing 25 hor er b r ho 8 <br />p g green. <br />g <br />4. Replace exi ste turf conditions and reduce water <br />con <br />5. Ren mprove drainage and playability and to reduce <br />unne -ssar -pas and maintenance. <br />Cornpeti ve <br />1. Expand driving range tee and add concrete tee line to improve turf quality, reduce <br />winter damage and increase revenue potential. <br />2. Install curbing and expand cart paths at tees and greens to improve turf quality and <br />reduce safety issue. <br />3. Correct drainage issues on holes No. 1,2,3,4 and 14. <br />4. Realign cart path on holes No. 1 and 4 to improve safety and playability. <br />5. Construct new back tee on No. 4 to reduce safety issue and increase overall teeing <br />area <br />Comprehensive <br />1. Construct new forward tees on holes No. 4 and 14 to improve playability and <br />increase teeing area. <br />2. Replace or repair pond liners. <br />3. Reconstruct short -game practice area to reduce maintenance and provide better <br />learning experience. <br />4. Construct a nursery green for use in repairing turf loss and damage. <br />5. Re -grass fairways to improve turf quality and reduce turf loss.. <br />Ill:r,r(urr;1 (.,Qu- Cot R.0 .ar( 1/111 rs PA( t_ 14 Ocn )131,R 1 7, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.