My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Study Session Agenda and Packet 2011 10 11 SP 2012 BUDGET
PORTAL
>
CITY COUNCIL RECORDS
>
STUDY SESSIONS (45.010)
>
2010-2019 City Council Study Sessions
>
2011 City Council Study Sessions
>
City Council Study Session Agenda and Packet 2011 10 11 SP 2012 BUDGET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:05:42 PM
Creation date
11/14/2011 10:09:22 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
6C5
Record Series Code
45.010
Supplemental fields
Test
SSAGPKT 2011 10 11 SP 2012 BUDGET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNCIL COMMUNICATION <br />TO: MAYOR AND CITY COUNCIL <br />FROM: MALCOLM FLEMING, CITY MANAGER <br />DATE: OCTOBER 11, 2011 <br />SUBJECT: DISCUSSION /DIRECTION - 2012 PROPOSED BUDGET <br />ORIGINATING DEPARTMENT: CITY MANAGER'S OFFICE /FINANCE <br />SUMMARY: <br />City Council had its first preview of the proposed 2012 Budget at the October 4, 2011 City <br />Council meeting. A number of comments /suggestions for revisions to the budget were <br />provided at that meeting. Those items have been addressed in the attached Revised 2012 <br />Proposed Budget — Summary by Programs and Funds (Attachment A), Revised Capital <br />Improvements Plan, 2012 -2016 (Attachment B) and a modified PowerPoint presentation <br />(Attachment C). Those changes include the following: <br />1) The McCaslin /Washington underpass has been moved from 2015 to 2012 and 2013 in <br />the CIP. Design costs of $175,000 were included in 2012 and $1,025,000 in 2013 for <br />construction for a total of $1.2 Million. The funding was charged 50% to Conservation <br />Trust -Land Acquisition Fund, 33% Capital Projects Fund and 17% Water Utility Fund. <br />2) General Fund transfer to the Capital Projects Fund of $2 Million remains in 2012, but <br />could be delayed until 2013. Staff will discuss implications of both scenarios at the <br />meeting. <br />3) The South Street Underpass funding was changed slightly to charge $100,000 to Storm <br />Water. <br />4) Changed the increase in water rates to 6% per year from 2012 through 2016. <br />5) Changed the increase in wastewater rates to 3% per year from 2012 through 2016. <br />6) Increased the current year (2011) sales tax projections to 1 % over 2010 (was 0 %). This <br />is supported by current trend analysis and, in effect, increases the amount in 2012, so <br />the 0% increase for 2012 remains. Also increased the 2013 sales tax from 0% to 1% <br />over 2012. <br />7) Re- labeled "North Plant Tank roof Replacement" to "3MG Tank Rehabilitation and <br />increased the amount from $1,000,000 in 2012 to $185,000 in 2012 and $1,140,000 in <br />2013. These changes are based on a resubmitted 2011 -2015 request from Public <br />Works. <br />8) Delay in Shops Project - In 2011 staff initiated work on the City Shops project. During <br />the time initial space needs were being reviewed it was concluded that the sight was <br />impacted by an existing floodplain. Work was commissioned to gain further <br />understanding as to the impact the floodplain may have on possible site plans. During <br />this effort it was found the existing City Shops area had never been platted or obtained a <br />PUD. It was concluded this would be a necessary part of the current City Shops project <br />but was not allotted time in the conceptual schedule. <br />SUBJECT <br />DISCUSSION /DIRECTION - 2012 <br />PROPOSED BUDGET <br />AGENDA ITEM <br />5) <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.