Laserfiche WebLink
City of Louisville Planning Department <br />MEMORANDUM <br />To: LRC Commissioners <br />From: Gavin McMillan, AICP, Planner III <br />Subject: The 42 Gateway — Integrated Infrastructure Implementation Plan <br />Date: November 14, 2011 <br />The Integrated Infrastructure Implementation Plan for Highway 42 and the <br />Louisville Station Area officially kicked off on November 9th with a walking audit of <br />the corridor and a public meeting. The project has been renamed The 42 <br />Gateway ". <br />The next step in the process is stakeholder interviews. Over the next couple of <br />months, the consultant for the project (Atkins) will conduct strengths, <br />weaknesses, opportunities, and threats analyses (SWOT analyses) with various <br />stakeholders in the 42 corridor. <br />Atkins will lead a SWOT analysis with the LRC at their December 12th meeting. <br />In preparation for that analysis, Planning Staff will give a presentation at the <br />November LRC meeting to begin a conversation of the strengths, weaknesses, <br />opportunities, and threats facing the station area and the 42 corridor. That <br />presentation and a memo outlining the specifics of a SWOT analysis are included <br />for your consideration. <br />749 Main Street • Louisville, CO 80027 • 303.335.4592 • FAX 303.335.4550 <br />www.ci.louisville.co.us <br />