My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Historic Preservation Commission Agenda and Packet 2011 11 21
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
HISTORIC PRESERVATION COMMISSION
>
2005-2019 Historic Preservation Commission Agendas and Packets
>
2011 Historic Preservation Commission Agendas and Packets
>
Historic Preservation Commission Agenda and Packet 2011 11 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 3:08:15 PM
Creation date
12/12/2011 10:28:01 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
HPCPKT 2011 11 21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Raimo Construction, Inc. <br />Quality Building <br />November 3, 2011 <br />City of Louisville Planning Dept. <br />Attn. Sean McCartney <br />Estimates <br />Project Address: 1131 Jefferson Ave., Louisville, CO 80027 <br />Description of Work: Foundation work per plans provided. <br />Cut and remove sections of existing concrete slab. Excavate, form and pour seven (7) new <br />concrete piers per structural plan. <br />Install adjustable steel columns and structural steel beams per plan. <br />This estimate includes removal of all concrete and excavated soil from job site. <br /> Estimated Project Cost: $11,850.00 <br />Description of Work: Alterations to Main Roof per plans provided. <br />Remove one layer of cedar shakes and three layers of asphalt shingles from main roof. <br />Remove portions of skip sheathing as necessary. <br />Install new structural beams and props per structural plan. <br />Resheet roof with 7/16" OSB on top of skip sheathing. <br />Install new 40-year asphalt roof shingles. <br />This estimate includes removal and disposal of all construction debris generated by this project. <br /> Estimated Project Cost: $27,675.00 <br />Description of Work: Alterations to Front and Rear Lower Roof Areas per plans provided. <br />Remove one layer of cedar shakes and three layers of asphalt shingles from main roof. <br />Remove portions of skip sheathing as necessary. <br />Install new structural beams and props per structural plan. <br />Resheet roof areas with 7/16" OSB on top of skip sheathing. <br />Install new 40-year asphalt roof shingles. <br />This estimate includes removal and disposal of all construction debris generated by this project. <br /> Estimated Project Cost: $12,150.00 <br />These estimates are valid for 30 days. If you have any questions or concerns please call me at your <br />convenience. <br />Thank you for your time and consideration. <br />William Raimo, President <br />Raimo Construction, Inc. <br />914 Weld County Rd. 7 - Erie, CO - 80516 - (303) 818-1425 <br />raimoconstrucion@hotmail.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.